
Financing the purchase, renovation and fitting-out of a hotel, campsite or tourist accommodation
Find out how to search for grants to renovate, equip or create a hotel, campsite or tourist accommodation, and prepare a reliable financing plan.
Why search for grants before investing?
Renovating or creating tourist accommodation often involves several work packages at once: the building, rooms or rental units, communal areas, technical equipment, safety, accessibility, energy efficiency, digital tools and outdoor landscaping. Funding should therefore be designed as an overall plan rather than a one-off search for a grant to match a given quote.
A public grant can reduce part of the eligible cost, but it generally does not replace the equity contribution, the bank loan or the cash flow needed during the works. Schemes are territorialised and change over time. A municipality, a group of municipalities, a department or a region may support a project that matches its tourism strategy, while a similar project located elsewhere will not be a priority.
The first step is to precisely describe the project, its timeline, its budget, local benefits and expected results. You then need to check which schemes are open, who the eligible beneficiaries are, which expenses are covered and the date from which works may start. Do not order works solely on the basis of a general announcement about sustainable tourism or accommodation modernisation.
Which establishments can be concerned?
The scope can cover independent hotels, open-air hotels, campsites, holiday villages, tourist residences, hostels, gîtes and guest rooms, depending on each scheme's own rules. Legal form alone is not enough to establish eligibility: some windows require a company, others accept an association, a local public company, a local authority or an owner-operator.
The operator must be distinguished from the property owner. If one company operates the hotel while a property company (SCI) owns the building, the file must explain who bears the expenses, who owns the equipment and who will benefit from the investment. Grants may exclude certain expenses borne by an entity other than the applicant, or require a lease and term commitments.
Seasonal accommodation must also document the opening period, occupancy rate, target markets and expected effects on employment. Projects in rural, mountain, coastal areas or in a destination undergoing transition may match local priorities, but location alone does not guarantee a grant.
The main investments to map out
Draw up an inventory by work package: structural work and building envelope, roofing and insulation, joinery, heating and hot water, ventilation, lighting, sanitary facilities, bedding, furniture, professional kitchen, laundry, security systems, pool equipment, charge points, water management, landscaped areas, signage and booking software. Separate expenses essential for compliance from those that improve the customer experience or increase capacity.
For a campsite, describe separately the rental accommodation, sanitary blocks, utility networks, communal areas, leisure facilities, water management, shading and adaptation to climate risks. For a hotel, detail rooms, communal areas, lifts, catering, air conditioning, control systems and envelope renovation. For a gîte or guest rooms, work linked to the dwelling may fall under different rules from those applicable to a structured commercial activity.
This mapping avoids presenting a project as a single expense. Some funders may support an audit, engineering or a preliminary study, but not the works themselves; others may target only energy performance, accessibility, innovation or tourism quality. Budget lines must therefore stay identifiable from the quote through to the invoice.
Territorial grants: start with the region and the group of municipalities
For many tourist-accommodation projects, the most useful search starts with the regional council, the departmental council, the group of municipalities and the tourism development agency. Local authorities may offer grants for modernisation, upgrading, ecological transition, diversifying the offering, or developing four-season tourism. Criteria, budgets and timelines vary widely.
Check the official pages dedicated to business and tourism grants, then ask the reviewing department for written confirmation. Do not rely solely on an old page or an article presenting a scheme as permanent. Check the opening date, the deadline, the available budget, the minimum project size, caps, the aid rate, excluded expenses and publicity obligations.
An initial exchange before filing often reveals whether the project matches territorial priorities. Prepare a two-page note covering location, the applicant's status, the forecast budget, the timeline, current and future capacity, works, economic benefits, jobs and environmental gains. Also ask whether the funder requires co-funding, certification, a classification or a preliminary study.
France Tourisme Ingénierie and structuring projects
Atout France runs tourism-engineering initiatives, including France Tourisme Ingénierie, with territorial partners. These schemes are not an automatic grant for every hotel or campsite. They aim in particular to accelerate investment projects and help bring them to fruition, with criteria that may relate to the project's scale, territorial impact, feasibility and engineering needs.
For a large-scale project, a complex renovation, a heritage site, or an investment that helps transform a destination, examine the programmes and calls for expressions of interest published by Atout France. Some schemes target specific territories or categories of project. Check their current status and timeline before including them in the financing plan.
Engineering assignments can help clarify positioning, market research, sizing, the legal structure, funding needs and the business model. This support does not necessarily amount to covering the works. In the budget, therefore, separate study and support expenses from physical investments, then check the applicant's financial-contribution terms.
European funding and territorial development
European funding can be relevant when the tourism project contributes to ecological or digital transition, inclusion, innovation, employment or territorial development. There is, however, no single European fund that automatically funds hotels and campsites. Access depends on the programme, the managing authority, the territory, the objectives and the expense rules.
The European Agricultural Fund for Rural Development and LEADER approaches may, depending on the territory and local strategies, concern certain tourism projects in rural areas. Other programmes may apply when a project has a cooperation, heritage, transition or innovation dimension. The actual possibilities must be checked with the managing authority and the relevant local action group.
A European application may require more engineering, supporting documents, monitoring and traceability than a local grant. Payment schedules can also affect cash flow. Before relying on this lead, check the open call, the eligible applicant, the territory, cumulation rules, outcome indicators and the repayment method. A programme mentioned in a guidance document is not necessarily open to your project on the filing date.
Energy renovation and sustainable tourism
Energy-efficiency works can include insulation, replacing heating or hot-water systems, controls, ventilation, lighting, heat recovery and certain consumption-monitoring equipment. For a tourist establishment, the economic value also depends on the number of days open, occupancy, energy prices, expected comfort and maintenance.
ADEME and local authorities have developed or supported various initiatives linked to sustainable tourism. However, the scope and availability of schemes change over time. You must check whether a grant is currently open, whether it targets businesses of your size, and whether it funds the investment, the audit, support, or only certain expenses. Do not assume that an old "sustainable tourism fund" remains available under the same rules.
An energy audit or technical study can help prioritise investments and quantify gains. Keep baseline consumption data, invoices, the characteristics of existing equipment and post-works assumptions. Forecast savings must be realistic and documented. If works are phased, check whether the funder accepts successive operations or requires a coherent programme from the outset.
Accessibility, safety and compliance
Accessibility and safety works must be described separately: walkways, sanitary facilities, access to rooms, signage, emergency lighting, alarm systems, fire compartmentalisation, electrical installations or other regulatory equipment. Obligations vary according to the establishment's nature, capacity, classification and applicable regulations. Have the diagnostic validated by a qualified professional.
The regulatory necessity of works does not guarantee the expense is grant-eligible. Some schemes support making premises accessible or improving the quality of reception, while others exclude mandatory works or fund only the portion going beyond the regulatory minimum. Present the diagnostic, requirements, quotes and compliance timeline without mixing these expenses with purely aesthetic improvements.
The "Tourisme & Handicap" label can be a relevant quality initiative for some establishments, but it must not be confused with financial support. It is based on reception and accessibility criteria and requires a specific procedure. If a local programme makes the grant conditional on a label or classification, confirm the exact rule before ordering the works.
Equipping rooms, kitchens and communal areas
Renewing bedding, furniture, kitchen, laundry, cleaning or reception equipment can represent a significant investment. Depending on the scheme, these purchases may be treated as professional equipment, movable equipment, or non-priority expenses. Everyday furniture and consumables are often treated differently from technical or resource-efficient equipment.
Compare purchase, leasing and long-term rental. Leasing can smooth cash flow, but it must not be assumed to be subsidised by default. Ask the funder how it treats assets financed through leasing, the value used, rent payments, the purchase option and expenses incurred before notification. Also check whether recoverable VAT is excluded from the eligible base.
For each piece of equipment, record its use, capacity, consumption, service life, maintenance costs and link to the establishment's strategy. If the purchase improves service quality, document the expected effect on satisfaction, reception capacity or the length of the season. If the aim is environmental, use measurable indicators rather than vague wording such as "more eco-friendly equipment".
Campsites: rental accommodation and infrastructure
A campsite's investments are often very varied: mobile homes or other rental units, connections, utility networks, sanitary facilities, reception, leisure areas, pool, shaded zones, water-treatment equipment, waste management and climate adaptation. Movable assets, building works, networks and landscaping must be distinguished, as schemes may treat these categories differently.
Creating additional units must not be confused with modernising the existing offering. Funders may support one, the other, or neither, depending on territorial strategy. An increase in capacity must be consistent with authorisations, the local planning scheme, environmental constraints, sanitation and network capacity. A grant does not regularise a project that lacks the necessary authorisations.
Campsites located on the coast, in the mountains or in areas exposed to heatwaves may need to build in climate resilience: shading, planting, water management, energy efficiency, adapting spaces and safety. Describe local risks and concrete responses. Do not assume a project will be eligible just because it mentions climate adaptation: the call in force must actually cover this type of expense and this type of beneficiary.
Hotels: room renovation and upgrading
In a hotel, room and communal-area renovation works may target comfort, durability, accessibility, lower consumption, or adaptation to a particular clientele. Prepare a plan by phase and by floor, with closure periods, unavailable rooms, the payment schedule and the impact on turnover. This approach helps check that the establishment can withstand the works without weakening its cash flow.
Upgrading may require spending on furniture, bathrooms, bedding, air conditioning, catering, connectivity and services. Funders may favour projects that improve the overall quality of the offering or its sustainability, rather than a simple decorative refresh. Link each work package to a concrete, verifiable result: lower consumption, improved accessibility, a longer season, better quality of reception, or a more diversified clientele.
If the project changes the classification, capacity, use of certain rooms or the services offered, check the applicable formalities and the requirements of the relevant standard. A tourism classification is a quality and clarity tool for customers, but it is not in itself a promise of funding. The expenses and the grant's criteria must be analysed separately.
Gîtes, guest rooms and small accommodation
Small accommodation can face different rules depending on whether the property is operated as a business, let on an ancillary basis, or owned by an individual. Grants for businesses do not necessarily apply to an individual, and housing-renovation grants are not automatically open to premises used for a commercial tourism activity.
Clarify the tax situation, the nature of the activity, the VAT regime, the applicant's status and how the building is used. If the project combines a main residence and tourist accommodation, identify the areas and expenses linked to each use. A clear separation avoids presenting expenses under different regimes to the same window.
In a rural area, a gîte or guest-room project can contribute to the local offering, heritage or agricultural diversification. This may justify examining territorial schemes or rural-development programmes, but the eligible applicant, the territory, the nature of the activity and the set-up conditions must be checked. The existence of a public policy favouring rural tourism does not amount to an individual right to a grant.
Local taxation: exemptions to check separately
In some rural revitalisation zones or the territorial schemes that succeed them, local tax exemptions may exist for certain categories of hotels, furnished tourist lets or guest rooms, subject to conditions. They are not a grant paid to fund the works, and their application depends in particular on zoning, the activity, local resolutions and declaration procedures.
Check up-to-date official information and contact the relevant tax office or local authority to confirm the property's situation and filing dates. Do not budget for an exemption before checking the precise conditions and any local decision. Tax rules change and can distinguish the type of accommodation, the owner, the operator and the location.
In the financing plan, clearly separate grants, loans, repayable advances, guarantees, tax exemptions and cost savings. These levers do not have the same effect on cash flow or the same degree of certainty. A potential tax saving must not be presented as funds available to immediately pay a deposit on works.
Bank loans, guarantees and leasing
An investment grant can be supplemented by a bank loan, leasing or other business financing. Lenders generally examine repayment capacity, equity, historical profitability, forecasts, asset value, seasonality and the risk linked to the works. The file must therefore show how the business will cope during the works period and with repayments after reopening.
Bpifrance and banking networks offer different tools depending on the situation and the product concerned, but a tourism-specific loan should not be assumed to be available for every file. Ask the bank and the relevant bodies which offers are open, which fees apply, which guarantees are requested, and whether public support can be combined with the territorial grant being sought.
Leasing may suit certain movable equipment, but less so building works or expenses that cannot be funded through this mechanism. Compare total cost, rent, residual value, the purchase option, tax consequences and treatment in the financing plan. The decision must be based on total cost and cash flow, not just the amount of the first payment.
Build a realistic financing plan
Present the total cost excluding tax and including all taxes according to your regime, isolating recoverable VAT where applicable. Distinguish presumed eligible expenses, expenses to be confirmed, excluded expenses and ancillary costs. Include fees, diagnostics, insurance, arrangement fees, bridging interest, closure costs and working-capital needs. Budgets limited to works quotes often underestimate the real need.
Build several scenarios: a cautious scenario with no grant, a central scenario with confirmed funding, and a supplementary scenario if a still-uncertain grant is obtained. An application filed, or a positive exchange with a reviewing department, must not be counted as a secured resource. For essential expenses, plan a funding solution independent of the grant until the official decision is notified.
Check disbursement dates and payment terms. A grant may be paid after the works are completed, against paid invoices and supporting documents. The business must then fund the cash advance. Ask whether instalments are possible, whether a progress report is required, and how long the file review can take.
Cumulation of grants and public-aid rules
There is no universal rule that all grants can be combined. Cumulation depends on the legal regime, the expense base, the maximum intensity, the type of company, the territory and each scheme's clauses. Some grants may be incompatible, or cumulation may be allowed only up to a set limit. The applicable texts and the funder's instructions must be checked.
Disclose other grants obtained or applied for when the file requires it, stating their amount, status and the expenses concerned. Keep a cumulation matrix by invoice or work package so as not to fund the same expense twice beyond the authorised limits. A grant awarded to another entity in the group may also require specific analysis.
If the scheme falls under the de minimis regime or another State-aid regime, ask the reviewing department for the necessary information and check the thresholds in force on the application date. Do not rely on a cap found in an old article. The cumulation analysis must be documented before filing, then updated if new grants are awarded.
Expenses generally to watch
Routine operating expenses, ordinary wages, consumables, stock, expenses already committed, works carried out before the authorised date, expenses without a compliant invoice, or purchases from related suppliers may be excluded or subject to conditions. Rules are specific to each window: these points of caution should not be turned into a universal exclusion.
Purely aesthetic works, capacity extension, land purchase, property acquisition, furniture, project-management fees and communication expenses may be accepted or excluded depending on the programme. Ask for a precise answer item by item, especially if one work package groups together different types of work.
For each quote, show the supplier, the technical description, quantities, unit cost, total amount, VAT and planned dates. Avoid vague labels such as "complete renovation" with no detail. A sufficiently precise quote makes the review easier, helps compare bids, and later helps justify the expenses actually incurred.
When to file the application?
The cautious approach is to contact the funder and file a complete application before starting works or making an irreversible commitment, unless an official rule says otherwise. Depending on the scheme, a signed quote, a purchase order, a deposit or the actual start of works may be considered the start of execution. Have the applicable definition confirmed in writing.
The timeline must include obtaining authorisations, studies, consulting contractors, filing the application, the decision, the works, the tourist season and expense checks. Works started too early can jeopardise the grant; works delayed with no margin can cost a whole season. The schedule must therefore be realistic and include margins for review lead times and unforeseen events.
Do not confuse a request for information, an application to a call for projects, and an award decision. Only the official notification reveals the exact conditions of the grant awarded. Keep exchanges with the funder and note any suspensive conditions or additional documents expected.
Preparing the file: documents and evidence
The file often includes a company presentation, a registration extract, annual accounts, a forecast, a financing plan, a project description, quotes, a timeline, authorisations and documents linked to the site. The exact documents depend on the scheme. Use the most recent official list and name files consistently to avoid version errors.
Add a note explaining why the project is necessary, what will be carried out, the expected benefits and how results will be measured. For an energy project, provide baseline consumption data and savings estimates. For a territorial tourism project, document seasonality, the target market, local benefits, employment and complementarity with the existing offering.
Forecasts must be consistent across the business plan, the quotes, reception capacity and the financing plan. If the project has several phases, specify the scope requested from the funder and the expenses planned for later. A transparent presentation of uncertainties is preferable to an unsupported promise of results.
Measuring the project's benefits
Funders may want to understand the project's effect on the destination's appeal, quality of reception, ecological transition, employment, the length of the season and local vitality. Choose suitable indicators: overnight stays, occupancy rate, opening period, energy consumption per overnight stay, water consumption, share of local purchases, jobs created or retained, accessibility and customer satisfaction.
Establish a baseline and set reasonable targets. An indicator must be measurable, defined and tracked over time. Avoid claiming a reduction in consumption without specifying the reference year, the building's scope and the occupancy-rate assumption. Results can be affected by weather, pricing, changes in clientele or activity fluctuations.
If the funder requires commitments after completion, identify who collects the data, how often, and for how long. The cost of monitoring and any obligations to maintain the investment must be factored into the project's organisation. Documenting results also makes future investment files easier to prepare.
Common mistakes to avoid
The first mistake is looking for a grant only after signing the quotes or starting the works. The second is targeting a generic national scheme without examining local grants. The third is assuming every expense of a tourist establishment is eligible under the same window. These mistakes are prevented by preparing the project and checking the rules before any commitment.
Other common mistakes include confusing an announced grant with an open call, using an old page, forgetting the cash flow needed before payment, underestimating ancillary costs, failing to disclose other grants, or treating a classification as a sufficient condition. A solid project can be refused if the application is incomplete or the timeline does not meet the rules.
Finally, do not build the business plan on a hypothetical grant. Test profitability without the grant, then measure the effect of any grant on cost and timeline. This method shows whether the project remains viable if refused, reduced in amount, or paid late.
Practical method for identifying schemes
Start by recording the site's exact location, the type of accommodation, the applicant's status, the company's size, the nature of the expenses and the timeline. Then search regional, departmental and inter-municipal schemes, energy-transition grants, rural-development programmes and relevant calls published by national bodies. Each result must be checked on the funder's page.
For each lead, record the scheme's name, the funder, the official URL, the verification date, the call's status, the beneficiaries, the expenses, the amounts or rates where published, cumulation rules, and the reviewing contact. Use distinct statuses: "open and confirmed", "announced but opening to be confirmed", "closed", "to be checked by territory" and "not suitable". This avoids presenting a mere lead as available funding.
Automated research can speed up the search, but it does not replace confirmation from the funder. Pages can change, budgets can run out, and rules can vary between territories. A dated check and proof of the source are essential before promising a grant or advising an investment decision.
Case study: renovating an independent hotel
Imagine an independent hotel planning to renovate its rooms, replace a boiler, improve insulation and renew part of its furniture. The file must separate the energy work packages, the building works, the equipment and the decoration expenses. Quotes must specify the equipment's characteristics, the timeline and any expected savings.
The applicant first checks local tourism and modernisation grants, then energy schemes open to businesses and bank-financing options. It asks the reviewing department whether furniture expenses are eligible, whether a prior audit is required, and whether the works must wait for the decision. The cash-flow plan allows for the temporary closure of rooms and for a possible payment after completion.
The cautious scenario counts no grant until it is notified. The central scenario shows confirmed funding, and the supplementary scenario separately shows pending applications. If the project cannot withstand the works without an uncertain grant, the phasing, the scope or the funding sources must be reviewed before committing.
Case study: modernising a rural campsite
A rural campsite wants to modernise its sanitary facilities, improve water management, install more resource-efficient equipment and renovate a few rental units. The file distinguishes the buildings, the networks, the equipment and the accommodation units. It also checks planning authorisations, sanitation rules and the compatibility of the works with the opening period.
The applicant liaises with the group of municipalities and the region, then examines territorial programmes and calls linked to sustainable tourism. If the project is located in an area covered by a rural-development programme, it checks with the competent authority whether the activity and the expenses are eligible. It does not assume that mentioning sustainable tourism alone opens a right to funding.
Expected results may include lower water consumption, better quality of reception, a longer season or better resilience to heatwaves. Objectives are quantified from baseline data and linked to the investments. Expenses and supporting documents are tracked package by package, including in the case of mixed funding.
Content written and under editorial review — this is not an eligibility assessment; only the personalised report applies your company's real criteria.
Beyond the guide
Check your actual eligibility for public grants
This guide presents the schemes recorded by Capital OS. The personalised report applies your real criteria — industry, size, location, project — before drawing any conclusion on eligibility.
See the opportunities identified by the scan, then access your personalised report.