
Feasibility Study for Solar Thermal Installation
ADEME supports feasibility studies for solar thermal installations on buildings, processes or heat networks for companies, local authorities, associations and public bodies, provided they use an RGE Études-certified provider or one with equivalent skills.
Before ordering a solar thermal installation, the feasibility study checks the solar potential, heat needs, sizing and operating conditions. ADEME requires the solution to be studied as part of a wider approach: reducing needs, pooling where relevant and looking at local waste heat and renewable resources.
Funded by ADEME
Run a personalised scan to identify the public grants and funding your company may be able to access.

Who can apply
Companies, local authorities, associations and public-sector bodies may be eligible in the regions listed on ADEME’s 2026 page. The project must concern a solar thermal installation covering heat needs.
Eligibility conditions
The study must follow the EnR’Choix approach and justify prior reduction of needs, any pooling, waste heat availability and the value of solar thermal among local resources. The provider must be RGE Études-certified or demonstrate equivalent skills accepted by ADEME.
What the scheme covers
Feasibility studies for solar thermal installations dedicated to a building or process, installations connected to a heat network, and combined solar systems. Deliverables must confirm technical and economic feasibility, sizing, technical solutions and the financial, administrative and legal arrangements.
Amount and funding terms
The funding rate falls under ADEME’s 2026 conditions “Études en faveur de la transition écologique” and depends on the service and applicant. The aid page publishes no universal cap; consult the official scale and the specifications for a dedicated installation, heat network or combined solar system.
How to apply
Choose the specifications for the technology, consult an RGE Études-certified (or equivalent) consultancy, then gather quotes and the site’s energy data. Contact ADEME’s regional office before applying on AGIR; do not sign the order before checking the rules on when work may start.
Timeline
Shown as running from 1 January to 31 December 2026, in the regions listed by ADEME. Applications are mostly reviewed by the regional office and prior contact is advised.
Key facts
- Funder
- ADEME
- Type of funding
- Grant
- Status
- Open
- Closes
- 30 December 2026
- Geographic scope
- 20 régions
Frequently asked questions
Which installations are covered?
Solar thermal installations dedicated to a building or process, on a heat network or as a combined solar system.
Must the consultancy be qualified?
Yes, RGE Études-certified or with equivalent skills demonstrated under ADEME’s conditions.
Does the aid fund the panels and works?
This scheme covers the feasibility study; the investment may then fall under separate aid for solar thermal installations.
Which alternatives must be examined?
Reducing needs, pooling, waste heat recovery and other local renewable energies, following the EnR’Choix approach.
Official source
Official ADEME page ↗(ademe_scraper)Applications are made from the official source (usually in French).
Other grants of type “grant”
Other grants from ADEME
Related needs and funding
Competitive calls for projects
Ecological transition and CSR
Capital and investment funds
Support and acceleration
Diagnostics and audits
Takeover and transfer
Discover the funding that fits your company
Check your eligibility for public grants
This scheme is only one of the grants your company may be able to access. Run a personalised scan to identify the funding opportunities that match your activity, location and project.
See the opportunities identified by the scan, then access your personalised report.




