
Support for Independent Hotels
The official regional page consulted indicates, outside the coast and the metropolitan area, a minimum of €50,000 excluding VAT, a cap on eligible costs of €400,000 excluding VAT and a maximum rate of 15%. Works on rooms must represent at least 50% of eligible costs. Structural works also depend on territorial and energy conditions. Targeted operations: structural works (joinery, floors between storeys, external insulation and roof insulation), subject to energy performance conditions for the building or the rehabilitation of a brownfield property; finishing works; new and/or used equipment, materials and furniture (quotes over €500); finishing works and equipment for creating up to 9 seasonal worker beds within the hotel.
For an independent hotel, first check the location (outside the Bordeaux metropolitan area and the coast for the parameters indicated), the cost threshold excluding VAT and the share of works on rooms. Before final quotes, check the municipality, the share of works on rooms, the energy conditions for structural works and that the application is submitted before the project starts. Consult the official source.
Funded by Région Nouvelle-Aquitaine
Run a personalised scan to identify the public grants and funding your company may be able to access.

Who can apply
Public project owners; businesses (excluding SCIs and sole proprietorships); associations. Targeted check: confirm the location and business size against the definition used by the funder.
Eligibility conditions
The catalogue does not record all the detailed conditions. Have the eligibility criteria, excluded costs, combination rules and application date confirmed in writing by the funder before any commitment. Checkpoint before committing: Before final quotes, check the municipality, the share of works on rooms, the energy conditions for structural works and that the application is submitted before the project starts. Consult the official source.
What the scheme covers
Structural works (joinery, floors between storeys, external insulation and roof insulation), subject to energy performance conditions for the building or the rehabilitation of a brownfield property; finishing works; new and/or used equipment, materials and furniture (quotes over €500); finishing works and equipment for creating up to 9 seasonal worker beds within the hotel. Before signing: obtain detailed quotes and check whether costs must be committed after the application or approval.
Amount and funding terms
Grant of: outside the metropolitan area and coast — 15% of eligible costs excluding VAT of between €50,000 and €400,000; metropolitan area and coast — 15% of eligible costs of between €50,000 and €300,000 excluding VAT. Do not treat the amount announced as an automatic entitlement: the aid depends on the applicable rules, the eligibility of costs and available funds.
How to apply
Recommended steps: 1) check the area and the business profile; 2) have the eligible costs and start date confirmed in writing; 3) prepare detailed quotes, a financing plan, proof of registration and the required certificates; 4) ask for the form and the rules in force; 5) keep proof of submission and wait for the funder’s confirmation before any spending if the rules require it. Specific to this aid: Before final quotes, check the municipality, the share of works on rooms, the energy conditions for structural works and that the application is submitted before the project starts. Consult the official source.
Timeline
No usable deadline is confirmed. Do not assume the scheme is open: check the validity date, the application timetable and budget availability with the funder.
Key facts
- Funder
- Région Nouvelle-Aquitaine
- Type of funding
- Grant
- Status
- Ongoing
- Maximum amount
- €400,000
- Automatically extracted — check the official source
- Minimum amount
- €50,000
- Automatically extracted — check the official source
- Funding rate
- 15%
- Automatically extracted — check the official source
- Geographic scope
- Nouvelle-Aquitaine
Frequently asked questions
What is the first criterion to check?
Before final quotes, check the municipality, the share of works on rooms, the energy conditions for structural works and that the application is submitted before the project starts. Consult the official source.
Can I start spending before applying?
Do not start on the basis of this page alone. Ask the funder whether quotes, orders or works before the application make the project ineligible, and get a written answer.
Which documents should I prepare?
At a minimum, prepare detailed quotes, the financing plan, proof of registration and location, and the specific documents listed by the funder in its rules or form.
Is the amount indicated guaranteed?
No. The catalogue amount must be confirmed in the current rules and depends on the cost base accepted, caps, combination rules and available funds.
Official source
No official URL is available in our data for this grant.
Other grants of type “grant”
Other grants from Région Nouvelle-Aquitaine
Related needs and funding
Competitive calls for projects
Ecological transition and CSR
Capital and investment funds
Support and acceleration
Diagnostics and audits
Takeover and transfer
Discover the funding that fits your company
Check your eligibility for public grants
This scheme is only one of the grants your company may be able to access. Run a personalised scan to identify the funding opportunities that match your activity, location and project.
See the opportunities identified by the scan, then access your personalised report.


