
Studies for the Creation, Extension or Modernisation of Business Waste Sorting Centres and Professional Waste Drop-off Facilities
ADEME supports public and private players with local feasibility studies prior to creating, extending or modernising commercial waste sorting centres and business waste collection sites, in the regions listed for 2026.
Before building or expanding a commercial waste sorting centre, a local study must demonstrate the available volumes, the capacity needed and the recovery outlets. ADEME funds this decision-making stage for sorting centre projects and waste collection sites reserved for businesses.
Funded by ADEME
Run a personalised scan to identify the public grants and funding your company may be able to access.

Who can apply
Public and private players with a study project for a commercial waste sorting centre or a business waste collection site. 2026 coverage is limited to the regions listed on the ADEME page, not all French regions.
Eligibility conditions
The study must justify the local need for the project, the target waste flows, existing and planned capacity, collection needs and material or energy recovery channels. Technical criteria and eligible costs must follow ADEME’s specifications.
What the scheme covers
Local feasibility studies to create, extend or modernise a commercial waste sorting centre or a business waste collection site. This entry covers preliminary studies; equipment investment falls under a separate scheme.
Amount and funding terms
Funding falls under ADEME’s 2026 conditions for investment studies. The official page does not publish a universal rate or cap; check the scale and the “Études invest” specifications before costing the application.
How to apply
Prepare data on waste supply and collection, current capacity, treatment scenarios and recovery outlets. Consult the “Études invest” specifications, confirm regional coverage with ADEME and apply on AGIR before ordering the study.
Timeline
Shown as running from 1 January to 31 December 2026 in the regions listed on the official page. Check geographical eligibility, the specifications and the regional procedure before applying.
Key facts
- Funder
- ADEME
- Type of funding
- Grant
- Status
- Open
- Funding rate
- 80%
- Automatically extracted — check the official source
- Closes
- 30 December 2026
- Geographic scope
- 11 régions
Frequently asked questions
Does this aid fund building the centre?
No, this scheme covers the local feasibility study; investments should be considered under the relevant separate scheme.
Which projects are targeted?
Studies prior to creating, extending or modernising commercial waste sorting centres and waste collection sites for businesses.
Who can apply?
Public and private players with a study matching the scheme.
Is coverage national?
No, ADEME’s 2026 page lists only some regions; check coverage before applying.
Official source
Official ADEME page ↗(ademe_scraper)Applications are made from the official source (usually in French).
Other grants of type “grant”
Other grants from ADEME
Related needs and funding
Competitive calls for projects
Ecological transition and CSR
Capital and investment funds
Support and acceleration
Diagnostics and audits
Takeover and transfer
Discover the funding that fits your company
Check your eligibility for public grants
This scheme is only one of the grants your company may be able to access. Run a personalised scan to identify the funding opportunities that match your activity, location and project.
See the opportunities identified by the scan, then access your personalised report.


