ERDF – Electric vehicle charging infrastructure powered by solar production (Réunion)
The regional action sheet covers electric vehicle charging infrastructure combined with a stand-alone solar installation. The catalogue mentions companies, associations, public bodies and local authorities, with priority announced for projects by micro-businesses and SMEs. The rate, cap, any technical requirements and opening conditions must be checked in the current regional action sheet.
Installing charging points can support the electrification of transport, but grid connection and electricity supply are major issues on an island. The ERDF scheme listed in Réunion targets electric vehicle charging infrastructure powered by stand-alone solar production. The project must demonstrate consistency between energy production, charging equipment and planned uses.
Funded by Région Réunion, Union Européenne-FEDER
Run a personalised scan to identify the public grants and funding your company may be able to access.

Who can apply
The beneficiaries mentioned are companies, associations, public bodies and local authorities or their groupings. Projects led by micro-businesses and SMEs are indicated as a priority in the catalogue. Eligibility must be confirmed according to location, the applicant’s status, the use of the charging points, the energy set-up and any rules applicable to infrastructure open to the public.
Eligibility conditions
The project must correspond to charging infrastructure combined with stand-alone solar production, according to the technical characteristics of the action sheet. Check the accepted power and configuration, sizing, eligible costs, grid connection, permits and commissioning obligations. The catalogue is not enough to confirm the rate or whether applications are open.
What the scheme covers
The costs mentioned include equipment, works and project supervision specifically linked to the stand-alone solar installation intended for charging electric vehicles. The budget must separate charging points, solar production, any storage equipment and associated works. Only items expressly accepted by the rules should be included in the aid calculation.
Amount and funding terms
The catalogue states: a grant whose amount will depend on the project. This does not constitute a promise of award or confirmation of the rate applicable to the project; check the public aid rate, the EU share, caps and the state aid scheme.
How to apply
1. Define the site, users and planned charging capacity. 2. Have a technical solution drawn up linking solar production and charging points, with the necessary permits. 3. Break down costs by equipment and works, separating items not directly related. 4. Have the active ERDF Réunion action sheet, the rate and technical requirements confirmed before placing any order.
Timeline
The catalogue mentions programming until 31 December 2027. This date does not confirm that the aid is currently open. Check with the Réunion Region the active application window, cost eligibility dates and any requirement to apply beforehand.
Key facts
- Funder
- Région Réunion, Union Européenne-FEDER
- Type of funding
- Grant
- Status
- Open
- Closes
- 31 December 2027
- Geographic scope
- La Réunion
Frequently asked questions
What is the “ERDF – Electric vehicle charging infrastructure powered by solar production” scheme for?
According to the catalogue, it supports the installation of electric vehicle charging infrastructure powered by solar production (accessible to the public and with no resale of surplus electricity). The scheme is available until 31 December 2027. It belongs to an ERDF/JTF programme; the title alone does not confirm that a call is open.
Who can benefit and what are the exclusions?
The catalogue mentions: companies; associations; public bodies; local authorities and their groupings. Projects led by micro-businesses and SMEs will be given priority. Eligibility also depends on the area, size and legal form, type of project, aid scheme and the criteria of the current implementation document (DOMO).
What amount or funding rate is provided?
A grant whose amount will depend on the project. Distinguish the EU aid rate from the total public aid rate, and check caps and eligible costs in the applicable action sheet.
Is the scheme open and how do I apply?
1. Define the site, users and planned charging capacity. 2. Have a technical solution drawn up linking solar production and charging points, with the necessary permits. 3. Break down costs by equipment and works, separating items not directly related. 4. Have the active ERDF Réunion action sheet, the rate and technical requirements confirmed before placing any order.
Official source
No official URL is available in our data for this grant.
Other grants of type “grant”
Other grants from Région Réunion, Union Européenne-FEDER
Related needs and funding
Competitive calls for projects
Ecological transition and CSR
Capital and investment funds
Support and acceleration
Diagnostics and audits
Takeover and transfer
Discover the funding that fits your company
Check your eligibility for public grants
This scheme is only one of the grants your company may be able to access. Run a personalised scan to identify the funding opportunities that match your activity, location and project.
See the opportunities identified by the scan, then access your personalised report.