Financing a resource centre, repair and reuse in rural areas with LEADER: a practical guide
Financing a resource centre, repair and reuse in rural areas with LEADER: a practical guide — for associations, social and solidarity economy (SSE) organisations, local authorities, businesses, resource centres, repairers,.
Financing a resource centre, a repair activity and reuse in rural areas with LEADER: a practical guide
1. Starting from a concrete territorial need
A resource centre, a recycling centre, a repair workshop or a reuse service can address several rural needs at once: reducing waste, making goods accessible at affordable prices, creating local activity, offering integration pathways, preserving know-how and bringing services closer to residents. The project becomes stronger when it is presented as an organised response to a territorial problem, rather than simply the acquisition of premises or a vehicle.
LEADER is a local development tool run by Local Action Groups (LAGs). It is not a uniform national scheme reserved for resource centres. The project must match the local development strategy, the selection criteria and the programming rules applicable in the territory. Depending on the local action sheet, an operation may be assessed under the heading of ecological transition, the local economy, local services, social innovation, cooperation or town-centre revitalisation. Confirmation must be obtained from the LAG before building a financing plan around LEADER.
The first task is to describe the need. Is there a distant waste collection site, limited access to repairers, demand for second-hand furniture, a lack of equipment for associations, a stock of construction materials, or difficulty for households to equip themselves? The answers must be backed by verifiable evidence: interviews with municipalities, available waste data, an inventory of players, analysis of the commercial offer, testimonials from associations, attendance at repair events and an estimate of potential volumes.
Avoid general statements such as "the territory needs a resource centre." Specify the municipalities served, the target audiences, the goods concerned, current distances, existing solutions and identified gaps. A project can be relevant even if a structure already exists: it may cover a poorly served geographical area, develop an under-addressed sector, offer preservation-focused collection, organise local repair services or pool equipment. However, complementarity must be demonstrated, and disorganised competition between local players must be prevented.
2. Distinguishing reuse, preparation for re-use, repair and recycling
These concepts are close but do not refer to exactly the same operations. Reuse generally concerns a product that has not acquired waste status and is used again for an identical purpose. Preparation for re-use concerns a product that has become waste and undergoes checking, cleaning or repair operations before being used again. Repair aims to extend the service life of a faulty item. Recycling transforms waste into materials or substances intended to be reintroduced into a production process. These distinctions can have consequences for the conditions of collection, storage, traceability and processing.
In the application file, describe the actual journey of the items: voluntary drop-off, collection, sorting, assessment, cleaning, repair, inspection, storage, sale or handover to a beneficiary, then routing of rejects to an appropriate channel. For each stage, identify who is responsible, the equipment needed, the safety rules and how quantities are recorded. It is important not to present every item that enters the premises as "reused": some may be unusable, hazardous, incomplete or too costly to restore.
A resource centre can also combine several activities: second-hand sales, a repair workshop, preservation-focused collection, awareness-raising, school activities, a materials library, tool lending or rental, collection of professional furniture, and support for local organisations. Not all of these activities automatically fall under the same administrative regime or the same funding possibility. Separate them in the technical description and in the budget so that the LAG can precisely examine what is being proposed.
Defining the scope is also essential for projects focused on a single sector. A bicycle repair workshop, a computer refurbishment service, a materials library for construction materials, or a furniture reuse activity can have a simpler model than a general-purpose resource centre. A scope must be chosen that is consistent with available skills, expected volumes, storage costs and outlets. A limited pilot project can be more credible than oversized equipment from the first year.
3. Choosing the right project model
The general-purpose resource centre collects, sorts, processes and resells various items. It can offer awareness-raising workshops and work with local authorities, associations and businesses. Its main challenge is flow management: incoming volumes, the share that can actually be processed, storage, handling and outlets. The business plan must measure these flows instead of assuming that all donations can be resold.
The repair workshop focuses on one or more product families: bicycles, small appliances, furniture, light agricultural equipment or IT equipment. The technical skills, the cost of parts, the availability of spare parts, warranty conditions, safety and an acceptable price for customers must be defined. A workshop can complement a resource centre or operate with an existing network of repairers.
The materials library organises the recovery and redistribution of reusable materials, for example doors, windows, fittings or materials from building sites. It must address quality, provenance, safety, storage, dimensions, compatibility with intended uses and liability in the event of a defect. Construction materials require particular vigilance: a lack of traceability or characterisation can make a stock unusable or risky.
Digital reuse collects and refurbishes computers, phones or peripherals. It involves secure data wiping, equipment traceability, management of batteries and electronic waste, software updates and verification of equipment condition. It can serve a digital inclusion objective, but the file must distinguish the technical refurbishment activity from support provided to beneficiaries.
The repair café or self-repair model provides tools, volunteers or technicians to help residents diagnose and repair their items. This model can limit investment, but it requires safety organisation, suitable insurance, clear liability rules and management of parts and consumables. A one-off event should not be treated as a structured professional sector without specifying the objectives and the resources involved.
Preservation-focused collection organises the recovery of items that are still usable before they become waste, in connection with waste collection sites, landlords, shops, tradespeople or businesses. The partnership must specify who owns the goods, who sorts them, how non-recoverable items are handled, and the conditions for access to sites. A partner's informal agreement does not replace an operational agreement.
4. Identifying the LAG and checking the local strategy
Identify the competent LAG based on the exact territory of the project, then request its local development strategy, the relevant local action sheets, the selection criteria, the application deadlines and the rules applicable to beneficiaries and expenditure. The Réseau national Agricultures et Ruralités and the EU CAP Network directory are starting points for identifying contacts, but the decisive rules are those that apply locally.
In the first exchange, present a two- to four-page note: territorial problem, proposed solution, lead applicant, partners, target audience, area served, timeline, estimated cost, expected results and funding needs. Ask precise questions: Is this type of applicant eligible? Does the project fall under a local action sheet? Are the premises, works or equipment potentially eligible? Can staff costs, communication, collection and operating costs be taken into account? What co-financing is required? What public procurement or competitive tendering rules apply? From what date can expenditure be committed?
Do not settle for a general verbal answer. Request the current documents and record the points to be confirmed. Eligibility depends on the programming period, the local action sheet, the applicant, the operation and the expenditure. A project supported in a neighbouring LAG creates no right in your territory. Likewise, the existence of an environmental priority in a local strategy does not mean that every circular economy expense will be selected.
If the project goes beyond the scope of a single LAG, explore inter-territorial cooperation. Several territories can work together on material flows, shared equipment, a repair network or a logistics platform. However, the added value of the cooperation must be demonstrated, responsibilities must be allocated, and the lead LAG or the appropriate funding arrangement must be identified. Cooperation should not be added artificially to a local project that could work without outside partners.
5. Building an operational partnership
A reuse activity rarely depends on a single player. Possible partners include the municipality or inter-municipal body, the waste management syndicate, waste collection sites, associations, social and solidarity economy (SSE) organisations, collection companies, repair tradespeople, landlords, existing resource centres, schools and businesses that generate stocks of goods. The application file must explain what each partner concretely contributes: flows, premises, expertise, staff, visibility, funding, equipment or outlets.
Prepare a roles matrix. Who collects? Who decides that an item is reusable? Who handles transport? Who owns the stock? Who takes charge of residual waste? Who carries out inspections? Who sells or gives away the products? Who monitors the indicators? Who funds shared costs? This clarification prevents conflicts once the activity starts and helps justify pooled expenditure.
Agreements should set out estimated volumes without promising unrealistic quantities, access locations and hours, safety rules, transfer of ownership, liability, data to be shared, duration and exit terms for the partnership. If a local authority provides premises or land, the legal and financial conditions of this arrangement must be examined. If an association is given access to a waste collection site, that access must be authorised and organised; it should not be assumed that items can be freely taken.
The project must also analyse existing structures. An existing resource centre can become a partner, provide expertise or share certain equipment. The goal is not to multiply buildings and fixed costs, but to fill a gap, increase the volumes processed or improve residents' access. If a new structure risks diverting the easiest-to-sell goods away from an existing player, explain how the partnership or specialisation will avoid this difficulty.
6. Building a credible budget
The budget must reflect how the activity actually operates. Study costs, investments, start-up costs, recurring expenses and revenue must be kept separate. A single table that mixes works, salaries, tool purchases and annual expenses does not allow viability to be assessed.
Subject to applicable rules, investment expenses may include fitting out the premises, handling equipment, workbenches, repair tools, shelving, weighing equipment, safety equipment, the traceability system, IT installations or certain collection equipment. Vehicles and works must be checked with particular care: they are not automatically eligible. Second-hand purchases, equipment acquired before the application, internal costs and staff costs may be subject to specific rules.
Operating expenses include, for example, rent, energy, insurance, consumables, maintenance, collection costs, salaries, training, software, communication, payment processing fees and the disposal of rejects. An investment grant does not necessarily cover these expenses. If the model depends on operating costs that are only covered for a short period, the applicant must present a funding trajectory for after the grant ends.
Potential revenue can come from second-hand sales, collection or repair services, contracts with businesses, services provided to local authorities, workshops, partner contributions or other authorised funding. Sales should not be overestimated: not all incoming items are sellable, prices must remain suited to the local market, and some goods may be given away or routed to a processing channel. Build at least a cautious scenario, a central scenario and a favourable scenario.
For each expense line, indicate the amount, the estimation method, the available quote, the period, whether it is an investment or operating cost, the planned funding, and the validation status with the LAG. The financing plan must distinguish confirmed resources from pending applications. A requested grant must not be presented as secured.
7. Planning cash flow and the timeline
Cash flow needs are a major risk. Expenses may be committed several months before a grant is reimbursed, and sales revenue may grow slowly. The timeline must therefore cover the study, the application, processing, the decision, any necessary authorisations, works, equipment purchases, recruitment, start-up and ramp-up. The temporal eligibility rules and the supporting documents expected must be confirmed with each funder.
Avoid signing a contract, accepting a quote, ordering equipment or starting works before checking the rules applicable to each funding source. The fact that a project is desirable, or that a contact has given a positive opinion, does not guarantee the eligibility of expenses already committed. If the premises need to be fitted out, obtain the necessary authorisations and check accessibility, fire safety, rules applicable to public reception, nuisances, vehicle flows and storage conditions.
Prepare a monthly cash flow plan covering at least the start-up period and the estimated time for grant payments. Identify unavoidable expenses, uncertain revenue, necessary advances and safety margins. Public funding may require precise supporting documents and compliance with deadlines; the applicant must know how to pay suppliers if reimbursement comes later than expected.
The communication timeline must also be realistic. Announcing an opening before securing the premises, authorisations, partners and collection arrangements can create expectations that are difficult to meet. A gradual opening — pilot workshop, limited collection, then expansion of sectors — can reduce financial risk and allow processes to be adjusted based on real data.
8. Exploring complementary funding
LEADER can be one building block of the funding if the project matches the local strategy. Other schemes should nonetheless be examined in parallel, without assuming they can be combined or that the same expenses can be funded twice. ADEME publishes schemes dedicated to studies and assessments, as well as investments in reuse, preparation for re-use and repair. Conditions vary depending on the scheme, the type of applicant, the nature of the equipment, the territory, application deadlines and expenditure. Check the current official page and the specifications before entering an amount in the financing plan.
Local authorities and waste management syndicates can contribute to the assessment, flow organisation, access to premises or collection partnerships. Regions, departments, inter-municipal bodies and other organisations may also offer grants for the circular economy, the SSE, integration, innovation or revitalisation. Banks, foundations, private contributions and own funds can supplement the financing arrangement depending on the nature of the applicant and the project.
The right approach is to create a matrix by expense: equipment or action, cost, prospective funder, conditions, timeline, possible combination, required documents and decision obtained. Ask each funder to confirm in writing the rules on combining funding, VAT treatment, eligible expenses and the need for co-financing. Funding for a study does not mean that investments will subsequently be funded. Likewise, a call for projects that has been announced or closed should never be presented as available funding without checking its status.
For an integration-focused project, clearly separate the funding of the reuse activity, supervision costs and employment-related schemes. A single budget line must not be presented without explanation as fully funded by several schemes at once. Each funding source's own rules must be respected and expenses broken down transparently.
9. Measuring results and demonstrating impact
A solid application combines economic, environmental and social results. Indicators must be measurable, defined in advance and proportionate to the size of the project. Possible indicators include: tonnes or units collected, share reused or repaired, quantity routed to recycling, number of items put back into circulation, number of repairs carried out, number of households served, workshop attendance, jobs created or maintained, training hours, active partnerships, turnover, and cost per item processed.
Define the units and calculation rules. If quantities are measured by weight, explain how they are weighed and how double-counting is avoided. If an item is collected, repaired and then sold, do not count it as three separate items. Separate incoming flows, reused flows, rejects and disposed waste. A recovery rate without a precise definition does not allow results to be compared.
Indicators must correspond to the baseline situation. If the territory does not have reliable data, indicate the method that will be used to establish a baseline during the pilot phase. Set reasonable targets, then plan a quarterly review to compare results against assumptions. A small number of indicators that are properly tracked is better than a long list that is never filled in.
Social impact must also be described concretely. It may involve access to cheaper equipment, the creation of local jobs, integration pathways, intergenerational activities, the transmission of know-how, or improved accessibility in remote municipalities. Do not confuse an intention with a result: state the actions, the expected beneficiaries and how the effects will be tracked.
10. Anticipating technical, legal and commercial risks
The first risk is insufficient or poor-quality volume. Before investing, carry out an assessment of available stocks, estimate the recoverable share and run collection tests. The second risk is the lack of outlets: a storage area can fill up quickly if products do not find buyers. Plan rejection criteria, a pricing policy, sales channels, partnerships and disposal procedures.
The third risk concerns safety. Electrical items, batteries, chemical products, incomplete equipment or potentially hazardous materials must not be accepted without appropriate rules. Inspection procedures, storage, handling, protective equipment and training must be sized according to the flows. Hazardous waste and waste electrical and electronic equipment require management that complies with applicable rules and appropriate channels.
The fourth risk is the economic model. A second-hand activity can have high sorting and handling costs and irregular revenue. Free goods are not free to process: transport, inspection, cleaning, storage, repair and unsold items all generate costs. Calculate the costs per sector and stop or adjust those that consume a lot of resources without sufficient benefit, unless their social or environmental value is explicitly funded.
The fifth risk is confusion between associative activity, commercial activity and public service. The legal status of the applicant, invoicing, tax obligations, competition rules, agreements with local authorities and State aid rules may require appropriate review. This guide does not replace a legal or accounting analysis of the chosen arrangement. The applicant must document its model, seek advice where necessary and ensure that contractual commitments match its capabilities.
The sixth risk is combining funding sources. Keep a register of grants requested and obtained, associated expenses, periods covered and supporting documents. Do not allocate the same invoice twice to different funders without an explicit authorised basis. Keep quotes, invoices, proof of payment, contracts, photos of equipment, attendance sheets and results data in line with the requirements of each programme.
11. 90-day action plan
Days 1 to 15: scope the need. Define the area served, the target audiences, the product families and the problems to solve. Conduct interviews with municipalities, the inter-municipal body, the waste management syndicate, SSE players, repairers and users. Map existing solutions and identify gaps without overlooking players already in place.
Days 16 to 30: test the flows and the model. Estimate volumes, organise a pilot collection or workshop if possible, measure the recoverable share and test outlets. Compare several scenarios: general-purpose, specialised sector, shared workshop, travelling collection or partnership with an existing structure. Calculate the costs of transport, sorting, storage and disposal of rejects.
Days 31 to 45: meet funders and the LAG. Obtain the local strategy and the relevant local action sheet. Present the scoping note and get a list of criteria to confirm. Examine ADEME schemes and local funding in parallel. Identify potentially eligible expenses, co-financing, the timeline and commitment rules.
Days 46 to 60: consolidate the partnership and the budget. Formalise roles, prepare letters of intent or agreements, gather quotes, build revenue scenarios and the cash flow plan. Check authorisation requirements, insurance, safety, storage rules and disposal channels for rejects.
Days 61 to 75: write the application. Present the need, objectives, beneficiaries, territory, solution, method, partners, timeline, budget and indicators. Match each expense to an action and a result. Attach the required documents and clearly distinguish confirmed funding from pending applications.
Days 76 to 90: get it reviewed and decide. Have the application reviewed by the LAG and relevant partners before submission if this step is planned. Check dates, documents, authorisations and rules on combining funding. Do not start spending until the temporal eligibility rules and necessary authorisations are clarified. If funding or volumes are not sufficiently secured, adjust the scope rather than launching a project that is too costly.
12. Checklist before submission
- The territorial need is documented and the area served is precise.
- Existing players have been identified and the project's complementarity has been demonstrated.
- The competent LAG has been identified and the current local action sheet has been reviewed.
- The eligibility of the applicant, the activities and the expenses has been confirmed, or the open points are clearly listed.
- The journey of the goods, sorting criteria, rejects and processing channels are described.
- Partners have precise operational roles.
- The premises, access, safety, insurance and authorisations have been reviewed.
- The budget distinguishes studies, investments, operations, revenue and cash flow.
- Quotes, costs and assumptions are documented.
- Complementary funding has been checked against current official pages.
- Rules on combining funding and expected supporting documents have been identified.
- Indicators have a definition, a data source and a tracking frequency.
- Expenses are not committed before confirmation of applicable rules.
- A funding solution is planned for the continuity of the activity after the grant period.
Conclusion: financing a useful and viable activity
Reuse and repair can strengthen the local economy by extending the life of goods, developing local services and creating jobs that cannot be relocated. But good environmental intentions are not enough to guarantee the viability of a resource centre. The project must be based on real stocks of goods, organised flows, outlets, skills, controlled cash flow and operational partnerships.
LEADER can be a funding avenue when the project matches the LAG's strategy and the conditions of the local action sheet. ADEME and other funders may offer complementary schemes, each with its own criteria and timelines. The right approach is therefore to check each funding source against an up-to-date official source, have the rules confirmed by the relevant contacts, and never present potential funding as secured before the formal decision.
FAQ
1. Can a resource centre be funded by LEADER?
This is worth examining, but it is never automatic. The project, the applicant, the territory, the expenses and the timeline must match the local strategy and the LAG's local action sheet. Contact the LAG before committing any expenses.
2. Can a private business submit a project?
This depends on local rules and the scheme concerned. Some local action sheets may admit businesses, others may restrict beneficiaries. Check the eligibility of the legal status and the activity, as well as the rules applicable to public aid.
3. Can LEADER fund salaries and operating costs?
This should not be assumed. Staff and operating expenses are subject to the rules of the programme and the local action sheet. Ask the LAG for a precise answer on each budget line.
4. Does ADEME offer grants for reuse?
ADEME publishes schemes covering in particular studies and assessments, as well as certain investments in reuse, preparation for re-use and repair. Criteria, dates, eligible applicants and expenditure vary: check the current fact sheet before building the budget.
5. Can LEADER and an ADEME grant be combined?
Combining funding must be checked case by case. The rules may depend on the nature of the expenses, the aid scheme, the public funding rate and the instrument concerned. Have the arrangement confirmed in writing and avoid any unauthorised double funding of the same expense.
6. Do you need premises before applying for a grant?
Not necessarily in every case, but the real-estate solution must be shown to be realistic. A promise of availability, a site study or an alternative scenario can help. Check authorisations and commitment rules before signing contracts or starting works.
7. How do you prove there is enough stock of goods available?
Conduct interviews and an inventory with waste collection sites, municipalities, businesses, associations and residents. Organise a collection test if possible, measure volumes and the recoverable share, and document outlets. Assumptions must be cautious and verifiable.
8. Does a resource centre have to be general-purpose?
No. A repair workshop, a materials library or a digital reuse service may be more suitable if skills, flows and outlets are concentrated on one sector. The scope must be consistent with local needs and available resources.
9. What expenses need to be budgeted beyond equipment?
Plan for transport, sorting, storage, consumables, maintenance, insurance, safety, disposal of rejects, staff, communication and cash flow needs, among others. These costs can determine the project's viability even if the equipment itself is funded.
10. When can purchases begin?
Only after checking the rules applicable to each grant, particularly the expenditure eligibility date and any competitive tendering obligations. An initial contact or the submission of an application file does not constitute general authorisation to start.
Practical reference points
Action plan
- Document the territorial need; 2. Define the sector and the journey of the goods; 3. Identify the LAG and its local action sheet; 4. Formalise partnerships; 5. Cost out investments, operations and cash flow; 6. Check ADEME and other funding; 7. Define indicators; 8. Secure rules, timeline and authorisations; 9. Submit and track the project.
Eligibility conditions
To be confirmed with the LAG according to the local strategy, the local action sheet, the applicant's status, the territory, the nature of the project, expenses, timeline, co-financing and selection criteria. Separately check the conditions of ADEME schemes or other funders.
Funding and instruments
Possible LEADER/FEADER aid depending on the LAG; current ADEME schemes for studies/assessments and certain reuse, re-use and repair (RRR) investments; local, SSE, integration or circular economy grants to be examined separately. No universal LEADER rate is claimed; confirm the rules on combining funding.
Access and procedures
Map flows and players; identify the LAG via the Réseau national Agricultures et Ruralités or EU CAP Network; request the strategy and the local action sheet; prepare a scoping note, quotes, budget and cash flow plan; consult official ADEME fact sheets; obtain written confirmations before committing expenses.
Points of caution
Distinguish reuse, preparation for re-use, repair and recycling; check the status of goods and waste obligations; secure channels for rejects, batteries/WEEE and materials; do not overestimate volumes and revenue; check premises, safety, insurance, competition, State aid, combining of funding and the expenditure eligibility date.
Official sources
Written content, currently under editorial review — this is not an eligibility assessment; only your personalised report applies your company's actual criteria.
Grants cited in this guide
LEADER leverage aid
CC De l’Aire à l’Argonne
Up to €5,000
Regional investment aid for the food-processing industry (ARIAA – EAFRD)
Région Pays de la Loire, Union Européenne-FEADER
Up to €200,000
DJA — Young Farmers’ Grant (Dotation Jeunes Agriculteurs)
Ministère de l'Agriculture / FEADER (PAC)
Up to €80,000
EAFRD – investment aid for sawmills (Auvergne-Rhône-Alpes)
Région Auvergne-Rhône-Alpes, Union Européenne-FEADER
EAFRD — investment aid for wood-processing industries (Normandy)
Région Normandie, Union Européenne-FEADER
Closes on 31 Dec 2027
LEADER: modernising business premises – a local scheme to identify
Union européenne
Up to €22,500
LEADER/EAFRD: funding a local food resilience project
Union européenne
Up to €50,000
Closes on 31 Dec 2027
PCAE — Farm Competitiveness and Adaptation Plan
Régions / FEADER (PAC)
Up to €80,000
LEADER Programme 2023-2027 – Supporting the development of responsible production and consumption
Union européenne
Up to €50,000
Closes on 31 Dec 2027
LEADER Programme 2023-2027 – Action “Developing and promoting the local food system from production to consumption”
Union européenne
Closes on 31 Dec 2027
LEADER Programme 2023-2027 – Action “Encouraging collective initiatives, promoting economic resources and local entrepreneurship”
Union européenne
Closes on 31 Dec 2027
LEADER Programme 2023-2027 – Action “Fostering new services that facilitate access to employment and make the area more attractive”
Union européenne
Closes on 31 Dec 2027
LEADER Programme 2023-2027 – Sustainable tourism, slow travel and outdoor leisure
Union européenne
Closes on 31 Dec 2027
LEADER Programme 2023-2027 – Showcasing the area’s cultural, tourism and heritage assets
Union européenne
Up to €50,000
Closes on 31 Dec 2027
LEADER Coëvrons
Union européenne
Up to €50,000
Closes on 31 Dec 2027
LEADER Pays Vitryat
Union européenne
Closes on 31 Dec 2027
LEADER Berry Val de Loire
Union européenne
Closes on 31 Dec 2027
LEADER Golfe du Morbihan–Vannes
Union européenne
Closes on 31 Dec 2027
LEADER Loue-Lison
Union européenne
Closes on 31 Dec 2027
LEADER Pays Loire Touraine
Union européenne
Closes on 31 Dec 2027
LEADER Pays Vitryat
Union européenne
Closes on 31 Dec 2027
LEADER Pays Loire Touraine – Local food sector
Union européenne
Closes on 31 Dec 2027
LEADER Albigeois Bastides
Union européenne
Closes on 31 Dec 2027
LEADER – Businesses and projects creating local added value
Union européenne
Closes on 31 Dec 2027
LEADER – Biodiversity, resilience, waste reduction and pollutants
Union européenne
Closes on 31 Dec 2027
LEADER – Economic transitions and sustainable consumption
Union européenne
Up to €75,000
Closes on 31 Dec 2027
LEADER Haute-Corrèze Ventadour
Union européenne
Up to €50,000
Closes on 31 Dec 2027
LEADER Perche – Climate adaptation, biodiversity and energy transition
Union européenne
Closes on 31 Dec 2027
LEADER Perche – Services and new forms of mobility
Union européenne
Closes on 31 Dec 2027
LEADER: adapting everyday mobility and local services
Union européenne
Closes on 31 Dec 2027
LEADER: adapting existing buildings and bringing vacant homes back onto the market
Union européenne
Closes on 31 Dec 2027
LEADER: acting for the environment, biodiversity and local food
Union européenne
Closes on 31 Dec 2027
LEADER Loue-Lison: supporting the area’s sustainable transitions
Union européenne
Closes on 31 Dec 2027
LEADER Ouest Charente: developing emerging local sectors
Union européenne
Up to €25,000
Closes on 31 Dec 2027
LEADER Bresse bourguignonne: developing local, quality food
Union européenne
Closes on 31 Dec 2027
LEADER Îles et Estuaires charentais: structuring sustainable food and short supply chains
Union européenne
Up to €100,000
Closes on 31 Dec 2027
LEADER Ouest Charente: enriching the tourism offer and the visitor experience
Union européenne
Up to €25,000
Closes on 31 Dec 2027
LEADER Albigeois Bastides: amplifying ecological and energy transitions
Union européenne
Closes on 31 Dec 2027
LEADER Pays Thur Doller: structuring local and bio-based supply chains
Union européenne
Closes on 31 Dec 2027
LEADER Pays des 7 Rivières: developing attractiveness and services
Union européenne
Closes on 31 Dec 2027
LEADER: developing short supply chains and the circular economy
Union européenne
Closes on 31 Dec 2027
LEADER: strengthening links between urban and rural areas
Union européenne
Closes on 31 Dec 2027
LEADER: structuring local economic networks and the green economy
Union européenne
Closes on 31 Dec 2027
LEADER: preserving natural and energy resources
Union européenne
Up to €80,000
Closes on 31 Dec 2027
LEADER Alsace: preserving quality of life and supporting rural transitions
Union européenne
Closes on 31 Dec 2027
LEADER Pays Graylois: funding facilities and services accessible to all
Union européenne
Closes on 31 Dec 2027
LEADER Ventoux: developing lively, welcoming and caring rural services
Union européenne
Closes on 31 Dec 2027
LEADER Pays de Brest: setting up a cooperation project between areas and players
Union européenne
Closes on 31 Dec 2027
LEADER Pays Graylois: structuring local economic sectors
Union européenne
Closes on 31 Dec 2027
LEADER Perche Ornais: developing local supply chains and the circular economy
Union européenne
Closes on 31 Dec 2027
LEADER Haute-Vienne: reducing solo car use and developing alternative mobility
Union européenne
Up to €80,000
Closes on 31 Dec 2027
LEADER Pays d’Ancenis: developing sustainable mobility suited to residents
Union européenne
Up to €80,000
Closes on 31 Dec 2027
LEADER Pays de Gâtine: maintaining and developing local shops
Union européenne
Closes on 31 Dec 2027
LEADER Bresse bourguignonne: developing eco-tourism and slow tourism
Union européenne
Closes on 31 Dec 2027
LEADER Val de Loire Nivernais: promoting the area’s assets and opportunities
Union européenne
Closes on 31 Dec 2027
LEADER Loire Beauce: funding energy sobriety and renewable energy
Union européenne
Up to €125,000
Closes on 31 Dec 2027
LEADER: developing short food supply chains and local outlets
Union européenne
Closes on 31 Dec 2027
LEADER Est Creuse: modernising accommodation and enriching the tourism offer
Union européenne
Closes on 31 Dec 2027
LEADER Pays de Coutances: creating and maintaining useful rural services
Union européenne
Closes on 31 Dec 2027
LEADER Pays de Coutances: developing sustainable mobility solutions
Union européenne
Closes on 31 Dec 2027
LEADER Seine-et-Marne: consuming less and better in the area
Union européenne
Closes on 31 Dec 2027
LEADER Pays de Coutances: developing local farming and food
Union européenne
Closes on 31 Dec 2027
LEADER Déodatie: strengthening shops and the local economy
Union européenne
Closes on 31 Dec 2027
LEADER Haute-Vienne: modernising the tourism offer and outdoor leisure
Union européenne
Up to €80,000
Closes on 31 Dec 2027
LEADER: strengthening the local economy and the local productive base
Union européenne
Closes on 31 Dec 2027
LEADER: transforming practices and fostering new local models
Union européenne
Closes on 31 Dec 2027
LEADER Auxois Morvan: professionalising local production and short supply chains
Union européenne
Closes on 31 Dec 2027
LEADER Pays Thur Doller: improving the visitor experience and the quality of the offer
Union européenne
Closes on 31 Dec 2027
LEADER Auxois Morvan: connecting services, improving mobility and reducing energy use
Union européenne
Closes on 31 Dec 2027
LEADER Ouest Charente: creating activities and strengthening local services
Union européenne
Up to €25,000
Closes on 31 Dec 2027
LEADER: preserving natural, cultural and landscape common goods
Union européenne
Closes on 31 Dec 2027
LEADER Loire Beauce: structuring local environmental supply chains
Union européenne
Up to €125,000
Closes on 31 Dec 2027
LEADER: developing businesses that make the most of local resources
Union européenne
Closes on 31 Dec 2027
LEADER: preserving local resources and accelerating transitions
Union européenne
Closes on 31 Dec 2027
LEADER: preserving water, natural habitats and bio-based supply chains
Union européenne
Closes on 31 Dec 2027
LEADER: creating places and services that strengthen solidarity between generations
Union européenne
Closes on 31 Dec 2027
LEADER: fostering high-potential local economic supply chains
Union européenne
Up to €100,000
Closes on 31 Dec 2027
LEADER Isle en Périgord: developing alternatives to the private car
Union européenne
Up to €50,000
Closes on 31 Dec 2027
LEADER Isle en Périgord: creating a more sustainable, distinctive tourism offer
Union européenne
Up to €80,000
Closes on 31 Dec 2027
LEADER Isle en Périgord: adapting shops, crafts and local services
Union européenne
Up to €50,000
Closes on 31 Dec 2027
LEADER Isle en Périgord: bringing producers, shops and consumers closer together
Union européenne
Up to €50,000
Closes on 31 Dec 2027
LEADER: modernising food trades and local food distribution
Union européenne
Closes on 31 Dec 2027
Funding tangible investment for a social and solidarity economy project
Union européenne
Up to €150,000
Closes on 31 Dec 2027
LEADER: testing innovative services for a better life in the area
Union européenne
Closes on 31 Dec 2027
LEADER Loue Lison: modernising and diversifying a sustainable tourism offer
Union européenne
Closes on 31 Dec 2027
LEADER Pays Loire Touraine: making services more accessible to residents
Union européenne
Closes on 31 Dec 2027
LEADER: combining sustainable mobility and the local energy transition
Union européenne
Closes on 31 Dec 2027
LEADER: developing a new territorial and circular economy
Union européenne
Closes on 31 Dec 2027
LEADER: strengthening the area’s tourism and cultural appeal
Union européenne
Closes on 31 Dec 2027
Revitalising a town centre with an overall approach and concrete actions
Union européenne
Closes on 31 Dec 2027
Maintaining everyday economic activities in municipalities
Union européenne
Closes on 31 Dec 2027
Preserving the environment and preparing the area for climate change
Union européenne
Closes on 31 Dec 2027
Preserving heritage and strengthening the tourism offer of the Pays Vitryat
Union européenne
Closes on 31 Dec 2027
Developing a sustainable tourism offer that showcases local heritage
Union européenne
Closes on 31 Dec 2027
LEADER Programme 2023-2027 – Action “Promoting an area of shared goods and know-how around farming, food and crafts”
Union européenne
Closes on 31 Dec 2027
Creating a more attractive tourism offer rooted in the Gâtine
Union européenne
Closes on 31 Dec 2027
Reducing energy consumption and developing local solutions
Union européenne
Closes on 31 Dec 2027
Innovating in services and pooling local economic resources
Union européenne
Up to €80,000
Closes on 31 Dec 2027
Strengthening retail activity and services in town centres
Union européenne
Closes on 31 Dec 2027
Structuring a sustainable tourism and leisure offer across the area
Union européenne
Up to €80,000
Closes on 31 Dec 2027
Developing tourism by showcasing local identity and the area’s resources
Union européenne
Closes on 31 Dec 2027
Developing a sustainable local economy, short supply chains and activities rooted in the area
Union européenne
Up to €50,000
Closes on 31 Dec 2027
Testing mobility solutions suited to everyday travel
Union européenne
Up to €120,000
Closes on 31 Dec 2027
Strengthening local businesses and local food supply chains
Union européenne
Closes on 31 Dec 2027
Funding a sustainable food project with LEADER
Union européenne
Closes on 31 Dec 2027
Funding the development of a micro-business with LEADER
Union européenne
Closes on 31 Dec 2027
Developing short supply chains and the local economy with LEADER
Union européenne
Closes on 31 Dec 2027
Developing the SSE and social innovation with LEADER
Union européenne
Up to €80,000
Closes on 31 Dec 2027
Developing the social and circular economy with LEADER
Union européenne
Closes on 31 Dec 2027
Creating a new tourism offer with LEADER
Union européenne
Closes on 31 Dec 2027
Funding a cultural or heritage project with LEADER
Union européenne
Up to €80,000
Closes on 31 Dec 2027
Funding the transition of supply chains, businesses and the general public
Union européenne
Closes on 31 Dec 2027
Creating new tourism and cultural offers with LEADER
Union européenne
Closes on 31 Dec 2027
Maintaining local shops and services with LEADER
Union européenne
Closes on 31 Dec 2027
Developing a circular and innovative rural economy with LEADER
Union européenne
Closes on 31 Dec 2027
Developing a circular economic activity with LEADER
Union européenne
Closes on 31 Dec 2027
Developing tourism, culture and heritage in the Côte des Bar
Union européenne
Closes on 31 Dec 2027
Showcasing local know-how with LEADER
Union européenne
Up to €50,000
Closes on 31 Dec 2027
Keeping essential shops in town centres with LEADER
Union européenne
Up to €150,000
Closes on 31 Dec 2027
Developing sustainable tourism with LEADER in the Déodatie
Union européenne
Closes on 31 Dec 2027
Funding tourism and promotion of the area with LEADER
Union européenne
Closes on 31 Dec 2027
Funding the energy, ecological and digital transitions with LEADER
Union européenne
Closes on 31 Dec 2027
Accelerating the energy, ecological and digital transitions with LEADER
Union européenne
Closes on 31 Dec 2027
Strengthening residential appeal with LEADER Aire à l’Argonne
Union européenne
Up to €50,000
Closes on 31 Dec 2027
Funding an ecological and energy transition with LEADER
Union européenne
Up to €50,000
Closes on 31 Dec 2027
Developing projects that create social ties with LEADER
Union européenne
Up to €50,000
Closes on 31 Dec 2027
Developing a high-quality, sustainable tourism offer with LEADER
Union européenne
Up to €200,000
Closes on 31 Dec 2027
Showcasing local produce through local food and sustainable tourism
Union européenne
Up to €125,000
Closes on 31 Dec 2027
Showcasing heritage and developing the cultural, tourism and sports offer
Union européenne
Up to €30,000
Closes on 31 Dec 2027
Promoting farm produce and structuring short supply chains
Union européenne
Up to €16,000
Closes on 31 Dec 2027
Showcasing tourist sites and vernacular heritage with LEADER
Union européenne
Closes on 31 Dec 2027
Making the most of local resources to build a sustainable future
Union européenne
Up to €120,000
Closes on 31 Dec 2027
Living the transition by making the most of the area’s resources
Union européenne
Closes on 31 Dec 2027
Boosting the local economy with LEADER Pays du Lunévillois
Union européenne
Up to €30,000
Closes on 31 Dec 2027
Revitalising heritage and visitor reception in the Pays du Lunévillois
Union européenne
Up to €30,000
Closes on 31 Dec 2027
Funding a rural development project with LEADER in Cœur du Jura
Union européenne
Closes on 31 Dec 2027
Funding alternative mobility and the enhancement of resources with LEADER
Union européenne
Up to €50,000
Closes on 31 Dec 2027
Matches established by comparing titles and by validated programme tags (AideTagLink) between this guide and the grant catalogue — not exhaustive, never an invented link.
Needs covered by this programme
No individual English page exists yet for each need — each card links to the matching grants.
Financing your fleet of clean vehicles
Financing a product or process innovation project
Financing the energy renovation of your business premises
Financing the refurbishment or renovation of a business building
Financing your circular economy and reuse projects
Financing an agricultural or agri-food project
Financing a local shop
Financing a boiler plant or a renewable heat network
Financing a circular economy project
Financing the renovation of a shop front or commercial premises
Financing tourist accommodation
Financing a tourism project
Financing a packaging reuse project
Financing a gender equality or inclusion project
Financing a business investment
Financing a biomass project
Financing company growth
Financing an ecological or sustainable transition project
Financing the setting-up of a business
Financing an energy feasibility study
Financing employment or inclusion for people with disabilities
Financing a rural or town-centre revitalisation project
Financing a transport or professional mobility project
Financing a restaurant or a food trade business
Financing your company's digital transformation
Financing the creation of a business
Needs inferred from the validated tags of the grants linked to this guide — never a guessed need.
Projects this programme can fund
Financing the creation of a vegetable-processing unit: equipment, hygiene and grants
Financing the modernisation of a farm: equipment, agricultural machinery and climate adaptation
Financing food processing: equipment, packaging and storage of agricultural products
Financing a more water-efficient agricultural irrigation project: storage, networks and control
Matches established via a real shared grant (validated programme tag) between this guide and the project page — not exhaustive, never an invented link.
Targeting this LEADER scheme?
Check your actual eligibility
Check whether your project involving resource centres; reuse; repair; recycling centres; circular economy; SSE; waste prevention matches your Local Action Group's (LAG) strategy, then contact them to confirm the criteria, timeline and co-financing before submitting an application.
Discover the opportunities identified by the scan, then access your personalised report.


