Reusing vacant housing and revitalising a town centre with a LEADER funding strategy

Reusing vacant housing and revitalising a town centre with a LEADER funding strategy — for municipalities and intermunicipal bodies, property owners, landlords, housing operators,.

Introduction — start from the usage problem, not the building A vacant home is not automatically a revitalisation project. It may be uninhabitable, too costly to renovate, located in a weak market, owned by an untraceable owner, or lacking access to utility networks. Conversely, a partially occupied building may house homes, a workshop, a service or an activity that the town centre is missing. The right starting point is therefore to define the local problem: a lack of housing for employees, difficulty housing seasonal workers, vacant commercial upper floors, an absence of affordable housing, the deterioration of a block, or the need to bring residents and services closer together. LEADER may potentially support certain components of a local strategy, but it is neither an automatic right to a grant nor a universal solution to a shortfall in property profitability. The project must first demonstrate its local usefulness, its lead organisation, its management model and its ability to last once the funding period has ended.

  1. Choose a precise problem statement Avoid a vague objective such as “renovate vacant housing”. Formulate a verifiable target: bring six homes above shops back into use, create a small stock of housing for seasonal workers, pilot temporary accommodation for new employees, convert a municipal building into affordable housing, or transform an old building into supported housing if needs and operators justify it. Each target involves different skills, costs, rules and funders. Define the population concerned, the geographic scope, the number of homes, the target rent level, the length of commitment and the envisaged manager. A one-page scoping note should summarise the problem, the beneficiaries, the expected results, the constraints and the decision to be taken at the end of the study. This note allows discussion with the Local Action Group (LAG) and partners without prematurely requesting aid for a project that is still unclear.

  2. Build a survey of the vacant stock Counting vacant homes is not enough. Cross-reference available data with on-the-ground observation and interviews. Distinguish frictional vacancy between two tenants, long-term vacancy, vacancy due to inheritance or joint ownership, uninhabitable housing, housing kept as a second home, and premises that are not legally housing. A vacant address may cover several flats, while a home declared vacant may be under renovation or occasionally used. The municipality can start by mapping the buildings, their apparent condition, their known occupancy status and obvious risks. Personal and tax information must not be disclosed without a legal basis. Set up internal tracking with restricted access, then publish only aggregated figures. The survey must also examine demand: households, employees, apprentices, older people, families, seasonal workers or newcomers. Renovating without checking who will be able to live in the home can create a costly asset that stays empty.

  3. Measure genuinely solvent demand Question local employers, estate agents, associations, social workers, training establishments, tourism operators and residents. Stated intentions are not always effective demand: ask about the type of housing, the number of people, the period, the monthly budget, the length of occupancy and mobility constraints. For seasonal workers, check peak dates, contract lengths and the possibility of sharing housing between employers whose seasons differ. For newly recruited employees, measure the number of recruitments delayed or abandoned for lack of housing. For affordable housing, distinguish the headline rent from the total cost borne by the household, including charges and energy. Demand must be tested before the size of the project is fixed. A ten-question survey, supplemented by written commitments from future users or employers, is often more useful than a general study with no local data.

  4. Select buildings using a feasibility grid Do not select a building just because it is available or iconic. Assess access, transport links, proximity to services, structural condition, damp, the roof, the floors, utility networks, energy performance, light, accessibility, fire safety and the possibility of creating suitable private spaces. Also check planning rules, easements, flood risk, heritage protections and neighbourhood constraints. For each building, draw up a sheet with known data, unknowns, likely cost, timeframes, risk level and the decision: proceed, request a further study, or abandon. Allow a margin for discoveries made on site, particularly in older buildings. A cheap building can become the most expensive one if the networks need replacing, if the change of use is impossible, or if the layout does not allow enough compliant homes to be reached.

  5. Determine the lead organisation and ownership The body that identifies the need is not necessarily the one that must buy, renovate and manage the property. The municipality may own the building, an association may run a service, a landlord may carry out the works, and a business may provide booking commitments. Clarify ownership, the right to carry out works, the length of the usage arrangement, liabilities, insurance, exit conditions and the fate of investments if occupancy ends. In a case of joint ownership or inheritance, check that all required authorisations can be obtained before committing significant study costs. If the project relies on a long-term lease, have the compatibility between the lease term, the amortisation of the works and the obligations attached to the funding checked. An oral agreement in principle secures neither the works nor the funding application. The lead organisation must have legal, financial and operational capacity suited to the scale of the project.

  6. Choose an intervention model Several models are possible: acquisition and management by a municipality, ownership by a social landlord, acquisition by a private operator, holding via a dedicated company, a usage agreement, or a partnership between owner and manager. The right model depends on the number of homes, the rent level, investment capacity, the risk taken on and the skills available. A municipality may prefer to mobilise an experienced operator rather than create a property activity it will not know how to manage. An association may support residents without becoming the owner. An employer may book housing without managing the buildings. Draw up a matrix assigning each party responsibility for works, letting, arrears, maintenance, tenant relations, compliance and reporting. If the arrangement is too complex for the volume involved, simplify it. Multiplying structures does not make the project more solid if no one is clearly responsible for the outcome.

  7. Define the use and the target group The programme must match demand and the building's constraints. Family housing, a studio for seasonal workers, temporary accommodation for employees and supported housing do not have the same layouts, equipment, service levels or operating rules. Avoid mixing groups without planning the necessary spaces, responsibilities and support. For seasonal workers, the sturdiness of furniture, arrangements for late arrival, storage, transport and the management of unoccupied periods matter as much as appearance. For year-round housing, acoustic quality, ventilation, energy costs and access to shops become decisive. If shared spaces are planned, define their use, upkeep and access rules. The goal is not to maximise the theoretical number of beds, but to provide housing that is liveable, suited to its purpose and legally operable. The specifications must be validated with potential users before final plans are launched.

  8. Check planning rules, housing rules and authorisations Renovation may require planning permission, a prior declaration or a building permit depending on the nature of the works and the change of use. Specific rules may apply within a heritage perimeter, near a listed monument or in a protected building. Creating several homes may trigger requirements regarding safety, ventilation, natural light, access, parking or utility networks. Applicable rules depend on the project and the location; they must be confirmed with the planning department and relevant professionals. If the housing is intended for letting, check decency criteria, the safety of installations, mandatory diagnostics and the energy requirements in force on the date the property is let. Operations falling under tourist accommodation, supported housing or a public-facing establishment may add further obligations. Do not assume that an authorisation granted for a previous use covers the new use. Document exchanges and written conditions before works begin.

  9. Carry out a technical and energy survey Before finalising the programme, have surveys carried out in proportion to the risk: structure, roofing, damp, utility networks, any presence of hazardous materials, ventilation, energy performance and the capacity of equipment. For older buildings, a visual inspection does not replace investigation where defects are suspected. Have several work scenarios compared: minimal safety restoration, full renovation, phased renovation, or abandonment of certain volumes. The cost must include studies, fees, inspections, insurance, connections, any taxes, project management costs, contingencies and equipment. Energy performance must be assessed together with summer comfort and ventilation, not just by adding insulation. A poorly designed renovation can shift damp problems or create overheating. Where the building has heritage interest, solutions must be discussed with the relevant authorities to reconcile conservation, use and energy efficiency. The investment decision must be based on overall cost, not on the works quote alone.

  10. Build a complete budget The project budget must separate acquisition or the usage arrangement, studies, structural works, the building envelope, utility networks, equipment, fittings, fees, financing costs, insurance, launch costs and contingency provisions. For a project in an occupied site or an older building, also plan safety measures and coordination between contractors. Operating income and expenditure must appear in a separate forecast account: rents, recoverable charges, vacancy, arrears, maintenance, minor repairs, letting management, insurance, taxation, common-area energy and furniture renewal. Do not treat an investment grant as a resource that will automatically cover annual deficits. Build three scenarios: central, cautious and adverse. Test a rise in works costs, a delayed opening, an occupancy rate below forecast, and capped rents. The project must show how it will survive once temporary funding has ended.

  11. Test rental viability and the cost to the occupant A rent that is theoretically sufficient to cover part of the charges may be unaffordable for the target group. Calculate the total cost home by home: rent, charges, heating, water, internet and any extra travel costs. Compare it with the budget of the targeted households and with rents charged locally. For seasonal housing, model periods with no income, reinstatement costs and booking conditions. For year-round housing, estimate vacancy between tenants, arrears, maintenance and management. A 100% occupancy rate all year round is rarely a cautious assumption. Identify who will cover a structural deficit: owner, employer, local authority, operator or other funder. If the balance depends on an unsecured annual grant, the project must be resized or its model changed. Rents, any caps and conventioning obligations must be checked against the scheme actually used.

  12. Examine funding options without building the project around an assumed grant LEADER may be relevant where a project matches the Local Action Group (LAG)'s strategy and has a demonstrable territorial dimension: keeping activity going, meeting a local need, reusing a building, housing workers, or improving access to services. But rules differ from one area to another. Certain property expenses may be excluded, limited or subject to specific conditions; operating costs and private works may be treated differently depending on the scheme. Contact the LAG before incurring any expenditure and ask for the action sheet, the current call for projects, eligible beneficiaries, eligible expenses, caps, rates, the timetable and the applicable public procurement or competitive tendering rules. Also ask whether the project must be completed within a given deadline, whether obligations to maintain the use apply, and what evidence will be required. The right question is not “how much will LEADER pay?” but “which part of this specific project can be supported, under what conditions and at what point?”

  13. Combine funding sources with caution Depending on the nature of the operation, it may be worth examining housing improvement grants, energy renovation schemes, local authority funding, loans, resources from a landlord, heritage funds or schemes dedicated to revitalisation. These options are not automatically cumulative: they may target different beneficiaries, works, groups or areas. Build a funding plan line by line. For each expense, state its amount, the funder approached, the legal basis or regulation, the potential rate, the submission date, the decision received and the payment conditions. Prevent any double funding of the same expense and check the rules on State aid where an economic activity is involved. The cash-flow plan must factor in the gap between paying for works and receiving grant payments. Advances and instalments must be financed even once the aid has been granted. A letter of intent is not a funding notification; a submitted application is not secured income.

  14. Organise project ownership and procurement Project ownership must be clearly identified, with a person able to steer studies, decisions, costs, timeframes and contractors. For bodies subject to public procurement rules, procedures and obligations must be checked before the tender. Even where a specific regime does not apply, comparing offers, keeping a record of choices and preventing conflicts of interest protect the project. Prepare a realistic timetable covering studies, authorisations, tendering, works, handover and letting. Avoid starting works before checking the start conditions imposed by funders. Define acceptance criteria, snagging, guarantees, technical documentation and liability in case of defects. A site schedule must include decisions to be taken, partner approvals and a margin for unforeseen discoveries. Delays carry a financial cost and can cause a recruitment or letting season to be missed.

  15. Plan management after the works The project does not end when the keys to the renovated building are handed over. The manager must be designated, along with application procedures, allocation criteria, lease drafting, the inventory of fixtures, rent collection, charge management, complaints and maintenance. If the homes are reserved for employees, formalise the employer's role and avoid confusing an employment contract with a tenancy agreement without suitable legal advice. For a stock shared between several businesses, specify booking rules, cancellations, liability for damage and priority during periods of high demand. Homes must be kept in good condition; plan an annual maintenance budget and a reserve for major works. Governance without an operational manager quickly becomes fragile. Measure incidents, re-letting times, repair costs and occupant satisfaction. The manager should be involved from the design stage to avoid discovering too late that the procedures or spaces are unsuitable.

  16. Address revitalisation at street level A housing programme can contribute to revitalising the town centre, but its effect depends on how well it fits into a broader strategy. Look at shops, public spaces, mobility, services, lighting, pedestrian routes and accessibility. Renovating housing above shops can improve day-to-day footfall and make premises easier to let, but it requires addressing independent access, acoustic insulation and safety. Converting a building into housing can also reduce useful commercial floor space; such trade-offs must be made explicit. Map planned interventions and coordinate them with owners, shopkeepers, landlords and technical departments. Works on a single building should not be presented as a comprehensive revitalisation without indicators to demonstrate it. Define observable results: homes brought back into use, new residents, employees housed, reduced vacancy, footfall at services, or improved condition of the built environment. Wider economic effects must be measured cautiously, without excessive attribution to a single project.

  17. Protect future occupants and prevent unwanted effects The project must ensure decent, safe and suitable housing. Prevent risks of overcrowding, indecent housing, excessive energy costs and poorly understood contracts. Selection criteria must be transparent and compatible with applicable law. Avoid a scheme intended for seasonal workers creating excessive dependency of the occupant on their employer, or leaving no solution when a contract ends. If social support is needed, it must be entrusted to a competent body with defined roles. The project must also monitor effects on the local market: renovation that pushes rents above the target level, competition with existing supply, conversion of permanent housing into tourist accommodation, or displacement of residents. Social objectives must be translated into allocation rules, rent levels and monitoring arrangements, not merely stated in the application's narrative. Complaints and difficulties must be able to be reported and handled through a known procedure.

  18. Define useful indicators Indicators must link spending to results. Measure the number of homes surveyed, buildings whose feasibility has been confirmed, homes actually brought back into use, the time between decision and first occupancy, the occupancy rate, the full cost per home and maintenance spending. For the target group, track the number of employees housed, length of stay, the share of households matching the stated need, the housing cost relative to income where this can be appropriately measured, and feedback from occupants. For the town centre, document trends in vacancy, links with shops and services, and coordination with other operations. Set a baseline value, a realistic target, a measurement frequency, a data source and a person responsible. Do not confuse an output indicator — works completed — with an outcome indicator — homes occupied and affordable. Personal data collection must remain proportionate, secure and compliant with applicable rules.

  19. Mistakes that derail a project The most common mistakes are choosing the building before checking demand, underestimating the works, confusing an investment grant with operating balance, assuming all forms of aid are automatically cumulative, committing expenditure too early, failing to name the manager, or relying on an unrealistic occupancy rate. Another mistake is wanting to save a building at any cost, even when its full cost far exceeds an alternative solution. Compare renovation with adapting another building, letting existing homes, mobilising private stock, or pooling resources between employers. Also avoid presenting general objectives without local evidence: a solid application shows needs, partner commitments and the logic behind the choices made. Finally, do not use national cost figures as a local quote. Obtain estimates suited to the building, the finish level, accessibility and site constraints.

  20. 90-day action plan Days 1 to 15: appoint the project lead, formulate the need, gather vacancy data and draw up an initial list of buildings. Days 16 to 30: meet employers, future occupants and housing operators; measure budgets and demand periods; rule out scenarios with no credible demand. Days 31 to 45: visit shortlisted buildings, examine ownership, planning status, utility networks and risks; commission only strictly necessary surveys. Days 46 to 60: compare holding and management models, draw up an initial works estimate and build an operating budget. Days 61 to 75: meet the LAG and potential funders, obtain written rules, check expense eligibility and build a cash-flow plan. Days 76 to 90: decide whether to proceed, amend or abandon; formalise partnerships, the timetable, indicators and the studies to be launched. This timetable is a preparation method, not a guarantee of processing or authorisation timeframes.

  21. Checklist before submitting an application Before submitting, check that the need is documented and beneficiaries identified; that demand has been tested with users; that ownership and rights over the building are secured; that the planned use is compatible with planning and housing rules; that surveys allow the works to be estimated; that the budget separates investment and operating costs; that viability has been tested under several scenarios; that a manager has been identified; that partners have confirmed their commitments; that funding is presented without double counting; that the timetable complies with start conditions; and that indicators have a baseline value and a target. Attach useful evidence: minutes, letters of interest, estimates, plans, surveys, resolutions or agreements in principle. Clearly distinguish secured elements, assumptions and pending points. If a major point — ownership, demand, technical feasibility or operating model — is not secured, it is better to complete the study than to submit a premature application.

  22. Conclusion — funding a lasting use, not just works Bringing vacant homes back into use can contribute to an area's attractiveness, access to employment and the revitalisation of a town centre, but only if the building matches real demand and someone can operate it sustainably. The quality of the project depends on concrete decisions: which group to house, at what cost, in which building, with what authorisations, under what management model, and with what maintenance capacity. LEADER must be considered as a possible source of territorial funding, never as a guarantee that works will be covered. The most robust approach is to start from demand, compare solutions, check local rules and secure cash flow before committing expenditure. A good project may also conclude that a building should be abandoned in favour of another solution. That decision avoids tying up public funds in an unsuitable asset. The desired outcome is not a completed building site, but homes that are occupied, safe, accessible to the target group and maintained over time.

FAQ — frequently asked questions

Question: Can LEADER fund the renovation of vacant housing? Answer: This is only possible if the LAG's strategy, the current call for projects and the applicable rules allow it. Property works may be subject to exclusions, caps or specific conditions: ask for written confirmation before incurring any expenditure.

Question: Must a municipality own the building? Answer: Not necessarily. However, the lead organisation must demonstrate sufficient rights to carry out the works and maintain the use for the required period. The length and conditions of the usage arrangement must be secured in writing.

Question: Can housing for seasonal employees be funded? Answer: The project must document the need expressed by employers and workers, the seasonal calendar, the booking model and the management of unoccupied periods. Eligibility depends on the LAG and the specific scheme.

Question: Must all surveys be carried out before contacting the LAG? Answer: No. Start with proportionate scoping and feasibility checks. Contact the LAG early to find out its rules, but do not commit expenditure that could jeopardise eligibility before checking the start conditions.

Question: Can housing renovation aid be combined with LEADER? Answer: Not automatically. Each funder may apply its own rules on combining aid, eligible expense base, beneficiaries and timetable. The funding plan must avoid declaring the same expense twice.

Question: How can you know whether a renovated home will actually be let? Answer: Question future occupants, employers and operators, check their budget, demand periods and access criteria. Written commitments or conditional bookings are more convincing than a simple general estimate.

Question: What rent level should be planned? Answer: The rent must be compared with the local market, the target group and any caps under the scheme. Also assess charges, energy, travel and vacancy; rent alone does not measure affordability.

Question: Can a former shop be converted into housing? Answer: This depends on the authorised use, the local land-use plan (PLU), safety, lighting, ventilation and access rules, and any heritage protections. Consult the planning department and professionals before finalising the programme.

Question: Who should manage the homes after the works? Answer: A designated owner, landlord, operator or manager must handle leases, maintenance, charges, complaints and re-letting. These responsibilities must be assigned and funded from the design stage.

Question: What indicators should be presented to the LAG? Answer: Beyond the amount spent on works, track homes brought back into use and actually occupied, time to opening, the occupancy rate, cost per home, the profile of groups housed and maintenance spending.

Practical overview

Action plan

Scoping the need; survey of the stock and of demand; building selection; securing ownership and use; technical surveys; holding and management model; investment/operating budget; written verification of funding; 90-day action plan; checklist before submission.

Eligibility conditions

To be confirmed with the LAG: local strategy and current call for projects, categories of beneficiaries, nature of works and eligible expenses, conditions relating to ownership or the usage arrangement, start rules, maintenance of use and publicity obligations. Do not assume that private housing works are eligible.

Funding and instruments

Consider depending on the project: LEADER if the action sheet allows it; housing improvement and energy renovation schemes; local authority funding; loans or holding by a landlord; heritage aid where the building is concerned. Combination rules, eligible expense base and timetable to be checked funder by funder.

Access and procedures

  1. Describe the local need and the target group; 2) check demand and the building; 3) contact the LAG before committing expenditure; 4) obtain the action sheet and written rules; 5) consult the planning department and professionals; 6) secure the lead organisation, ownership and manager; 7) draw up a budget and cash-flow plan; 8) submit according to the timetable and keep supporting evidence.

Points of caution

Risk of persistent vacancy; underestimated works; non-compliant housing; change of use; heritage protection; unsuitable rents; loss-making operating model; absence of a manager; grant timetable; combination of aid; public procurement rules; personal data; dependency on employers for seasonal workers.

Official sources

Written content, currently under editorial review — this is not an eligibility assessment; only your personalised report applies your company's actual criteria.

Grants cited in this guide

Grant

LEADER leverage aid

CC De l’Aire à l’Argonne

Up to €5,000

Grant

Regional investment aid for the food-processing industry (ARIAA – EAFRD)

Région Pays de la Loire, Union Européenne-FEADER

Up to €200,000

Grant

DJA — Young Farmers’ Grant (Dotation Jeunes Agriculteurs)

Ministère de l'Agriculture / FEADER (PAC)

Up to €80,000

Grant

EAFRD – investment aid for sawmills (Auvergne-Rhône-Alpes)

Région Auvergne-Rhône-Alpes, Union Européenne-FEADER

Grant

EAFRD — investment aid for wood-processing industries (Normandy)

Région Normandie, Union Européenne-FEADER

Closes on 31 Dec 2027

Grant

LEADER: modernising business premises – a local scheme to identify

Union européenne

Up to €22,500

Grant

LEADER/EAFRD: funding a local food resilience project

Union européenne

Up to €50,000

Closes on 31 Dec 2027

Grant

PCAE — Farm Competitiveness and Adaptation Plan

Régions / FEADER (PAC)

Up to €80,000

Grant

LEADER Programme 2023-2027 – Supporting the development of responsible production and consumption

Union européenne

Up to €50,000

Closes on 31 Dec 2027

Grant

LEADER Programme 2023-2027 – Action “Developing and promoting the local food system from production to consumption”

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Programme 2023-2027 – Action “Encouraging collective initiatives, promoting economic resources and local entrepreneurship”

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Programme 2023-2027 – Action “Fostering new services that facilitate access to employment and make the area more attractive”

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Programme 2023-2027 – Sustainable tourism, slow travel and outdoor leisure

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Programme 2023-2027 – Showcasing the area’s cultural, tourism and heritage assets

Union européenne

Up to €50,000

Closes on 31 Dec 2027

Grant

LEADER Coëvrons

Union européenne

Up to €50,000

Closes on 31 Dec 2027

Grant

LEADER Pays Vitryat

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Berry Val de Loire

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Golfe du Morbihan–Vannes

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Loue-Lison

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Pays Loire Touraine

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Pays Vitryat

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Pays Loire Touraine – Local food sector

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Albigeois Bastides

Union européenne

Closes on 31 Dec 2027

Grant

LEADER – Businesses and projects creating local added value

Union européenne

Closes on 31 Dec 2027

Grant

LEADER – Biodiversity, resilience, waste reduction and pollutants

Union européenne

Closes on 31 Dec 2027

Grant

LEADER – Economic transitions and sustainable consumption

Union européenne

Up to €75,000

Closes on 31 Dec 2027

Grant

LEADER Haute-Corrèze Ventadour

Union européenne

Up to €50,000

Closes on 31 Dec 2027

Grant

LEADER Perche – Climate adaptation, biodiversity and energy transition

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Perche – Services and new forms of mobility

Union européenne

Closes on 31 Dec 2027

Grant

LEADER: adapting everyday mobility and local services

Union européenne

Closes on 31 Dec 2027

Grant

LEADER: adapting existing buildings and bringing vacant homes back onto the market

Union européenne

Closes on 31 Dec 2027

Grant

LEADER: acting for the environment, biodiversity and local food

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Loue-Lison: supporting the area’s sustainable transitions

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Ouest Charente: developing emerging local sectors

Union européenne

Up to €25,000

Closes on 31 Dec 2027

Grant

LEADER Bresse bourguignonne: developing local, quality food

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Îles et Estuaires charentais: structuring sustainable food and short supply chains

Union européenne

Up to €100,000

Closes on 31 Dec 2027

Grant

LEADER Ouest Charente: enriching the tourism offer and the visitor experience

Union européenne

Up to €25,000

Closes on 31 Dec 2027

Grant

LEADER Albigeois Bastides: amplifying ecological and energy transitions

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Pays Thur Doller: structuring local and bio-based supply chains

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Pays des 7 Rivières: developing attractiveness and services

Union européenne

Closes on 31 Dec 2027

Grant

LEADER: developing short supply chains and the circular economy

Union européenne

Closes on 31 Dec 2027

Grant

LEADER: strengthening links between urban and rural areas

Union européenne

Closes on 31 Dec 2027

Grant

LEADER: structuring local economic networks and the green economy

Union européenne

Closes on 31 Dec 2027

Grant

LEADER: preserving natural and energy resources

Union européenne

Up to €80,000

Closes on 31 Dec 2027

Grant

LEADER Alsace: preserving quality of life and supporting rural transitions

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Pays Graylois: funding facilities and services accessible to all

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Ventoux: developing lively, welcoming and caring rural services

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Pays de Brest: setting up a cooperation project between areas and players

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Pays Graylois: structuring local economic sectors

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Perche Ornais: developing local supply chains and the circular economy

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Haute-Vienne: reducing solo car use and developing alternative mobility

Union européenne

Up to €80,000

Closes on 31 Dec 2027

Grant

LEADER Pays d’Ancenis: developing sustainable mobility suited to residents

Union européenne

Up to €80,000

Closes on 31 Dec 2027

Grant

LEADER Pays de Gâtine: maintaining and developing local shops

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Bresse bourguignonne: developing eco-tourism and slow tourism

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Val de Loire Nivernais: promoting the area’s assets and opportunities

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Loire Beauce: funding energy sobriety and renewable energy

Union européenne

Up to €125,000

Closes on 31 Dec 2027

Grant

LEADER: developing short food supply chains and local outlets

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Est Creuse: modernising accommodation and enriching the tourism offer

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Pays de Coutances: creating and maintaining useful rural services

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Pays de Coutances: developing sustainable mobility solutions

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Seine-et-Marne: consuming less and better in the area

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Pays de Coutances: developing local farming and food

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Déodatie: strengthening shops and the local economy

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Haute-Vienne: modernising the tourism offer and outdoor leisure

Union européenne

Up to €80,000

Closes on 31 Dec 2027

Grant

LEADER: strengthening the local economy and the local productive base

Union européenne

Closes on 31 Dec 2027

Grant

LEADER: transforming practices and fostering new local models

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Auxois Morvan: professionalising local production and short supply chains

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Pays Thur Doller: improving the visitor experience and the quality of the offer

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Auxois Morvan: connecting services, improving mobility and reducing energy use

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Ouest Charente: creating activities and strengthening local services

Union européenne

Up to €25,000

Closes on 31 Dec 2027

Grant

LEADER: preserving natural, cultural and landscape common goods

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Loire Beauce: structuring local environmental supply chains

Union européenne

Up to €125,000

Closes on 31 Dec 2027

Grant

LEADER: developing businesses that make the most of local resources

Union européenne

Closes on 31 Dec 2027

Grant

LEADER: preserving local resources and accelerating transitions

Union européenne

Closes on 31 Dec 2027

Grant

LEADER: preserving water, natural habitats and bio-based supply chains

Union européenne

Closes on 31 Dec 2027

Grant

LEADER: creating places and services that strengthen solidarity between generations

Union européenne

Closes on 31 Dec 2027

Grant

LEADER: fostering high-potential local economic supply chains

Union européenne

Up to €100,000

Closes on 31 Dec 2027

Grant

LEADER Isle en Périgord: developing alternatives to the private car

Union européenne

Up to €50,000

Closes on 31 Dec 2027

Grant

LEADER Isle en Périgord: creating a more sustainable, distinctive tourism offer

Union européenne

Up to €80,000

Closes on 31 Dec 2027

Grant

LEADER Isle en Périgord: adapting shops, crafts and local services

Union européenne

Up to €50,000

Closes on 31 Dec 2027

Grant

LEADER Isle en Périgord: bringing producers, shops and consumers closer together

Union européenne

Up to €50,000

Closes on 31 Dec 2027

Grant

LEADER: modernising food trades and local food distribution

Union européenne

Closes on 31 Dec 2027

Grant

Funding tangible investment for a social and solidarity economy project

Union européenne

Up to €150,000

Closes on 31 Dec 2027

Grant

LEADER: testing innovative services for a better life in the area

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Loue Lison: modernising and diversifying a sustainable tourism offer

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Pays Loire Touraine: making services more accessible to residents

Union européenne

Closes on 31 Dec 2027

Grant

LEADER: combining sustainable mobility and the local energy transition

Union européenne

Closes on 31 Dec 2027

Grant

LEADER: developing a new territorial and circular economy

Union européenne

Closes on 31 Dec 2027

Grant

LEADER: strengthening the area’s tourism and cultural appeal

Union européenne

Closes on 31 Dec 2027

Grant

Revitalising a town centre with an overall approach and concrete actions

Union européenne

Closes on 31 Dec 2027

Grant

Maintaining everyday economic activities in municipalities

Union européenne

Closes on 31 Dec 2027

Grant

Preserving the environment and preparing the area for climate change

Union européenne

Closes on 31 Dec 2027

Grant

Preserving heritage and strengthening the tourism offer of the Pays Vitryat

Union européenne

Closes on 31 Dec 2027

Grant

Developing a sustainable tourism offer that showcases local heritage

Union européenne

Closes on 31 Dec 2027

Grant

LEADER Programme 2023-2027 – Action “Promoting an area of shared goods and know-how around farming, food and crafts”

Union européenne

Closes on 31 Dec 2027

Grant

Creating a more attractive tourism offer rooted in the Gâtine

Union européenne

Closes on 31 Dec 2027

Grant

Reducing energy consumption and developing local solutions

Union européenne

Closes on 31 Dec 2027

Grant

Innovating in services and pooling local economic resources

Union européenne

Up to €80,000

Closes on 31 Dec 2027

Grant

Strengthening retail activity and services in town centres

Union européenne

Closes on 31 Dec 2027

Grant

Structuring a sustainable tourism and leisure offer across the area

Union européenne

Up to €80,000

Closes on 31 Dec 2027

Grant

Developing tourism by showcasing local identity and the area’s resources

Union européenne

Closes on 31 Dec 2027

Grant

Developing a sustainable local economy, short supply chains and activities rooted in the area

Union européenne

Up to €50,000

Closes on 31 Dec 2027

Grant

Testing mobility solutions suited to everyday travel

Union européenne

Up to €120,000

Closes on 31 Dec 2027

Grant

Strengthening local businesses and local food supply chains

Union européenne

Closes on 31 Dec 2027

Grant

Funding a sustainable food project with LEADER

Union européenne

Closes on 31 Dec 2027

Grant

Funding the development of a micro-business with LEADER

Union européenne

Closes on 31 Dec 2027

Grant

Developing short supply chains and the local economy with LEADER

Union européenne

Closes on 31 Dec 2027

Grant

Developing the SSE and social innovation with LEADER

Union européenne

Up to €80,000

Closes on 31 Dec 2027

Grant

Developing the social and circular economy with LEADER

Union européenne

Closes on 31 Dec 2027

Grant

Creating a new tourism offer with LEADER

Union européenne

Closes on 31 Dec 2027

Grant

Funding a cultural or heritage project with LEADER

Union européenne

Up to €80,000

Closes on 31 Dec 2027

Grant

Funding the transition of supply chains, businesses and the general public

Union européenne

Closes on 31 Dec 2027

Grant

Creating new tourism and cultural offers with LEADER

Union européenne

Closes on 31 Dec 2027

Grant

Maintaining local shops and services with LEADER

Union européenne

Closes on 31 Dec 2027

Grant

Developing a circular and innovative rural economy with LEADER

Union européenne

Closes on 31 Dec 2027

Grant

Developing a circular economic activity with LEADER

Union européenne

Closes on 31 Dec 2027

Grant

Developing tourism, culture and heritage in the Côte des Bar

Union européenne

Closes on 31 Dec 2027

Grant

Showcasing local know-how with LEADER

Union européenne

Up to €50,000

Closes on 31 Dec 2027

Grant

Keeping essential shops in town centres with LEADER

Union européenne

Up to €150,000

Closes on 31 Dec 2027

Grant

Developing sustainable tourism with LEADER in the Déodatie

Union européenne

Closes on 31 Dec 2027

Grant

Funding tourism and promotion of the area with LEADER

Union européenne

Closes on 31 Dec 2027

Grant

Funding the energy, ecological and digital transitions with LEADER

Union européenne

Closes on 31 Dec 2027

Grant

Accelerating the energy, ecological and digital transitions with LEADER

Union européenne

Closes on 31 Dec 2027

Grant

Strengthening residential appeal with LEADER Aire à l’Argonne

Union européenne

Up to €50,000

Closes on 31 Dec 2027

Grant

Funding an ecological and energy transition with LEADER

Union européenne

Up to €50,000

Closes on 31 Dec 2027

Grant

Developing projects that create social ties with LEADER

Union européenne

Up to €50,000

Closes on 31 Dec 2027

Grant

Developing a high-quality, sustainable tourism offer with LEADER

Union européenne

Up to €200,000

Closes on 31 Dec 2027

Grant

Showcasing local produce through local food and sustainable tourism

Union européenne

Up to €125,000

Closes on 31 Dec 2027

Grant

Showcasing heritage and developing the cultural, tourism and sports offer

Union européenne

Up to €30,000

Closes on 31 Dec 2027

Grant

Promoting farm produce and structuring short supply chains

Union européenne

Up to €16,000

Closes on 31 Dec 2027

Grant

Showcasing tourist sites and vernacular heritage with LEADER

Union européenne

Closes on 31 Dec 2027

Grant

Making the most of local resources to build a sustainable future

Union européenne

Up to €120,000

Closes on 31 Dec 2027

Grant

Living the transition by making the most of the area’s resources

Union européenne

Closes on 31 Dec 2027

Grant

Boosting the local economy with LEADER Pays du Lunévillois

Union européenne

Up to €30,000

Closes on 31 Dec 2027

Grant

Revitalising heritage and visitor reception in the Pays du Lunévillois

Union européenne

Up to €30,000

Closes on 31 Dec 2027

Grant

Funding a rural development project with LEADER in Cœur du Jura

Union européenne

Closes on 31 Dec 2027

Grant

Funding alternative mobility and the enhancement of resources with LEADER

Union européenne

Up to €50,000

Closes on 31 Dec 2027

Matches established by comparing titles and by validated programme tags (AideTagLink) between this guide and the grant catalogue — not exhaustive, never an invented link.

Targeting this LEADER scheme?

Check your actual eligibility

Check whether your housing, vacant-housing and town-centre revitalisation project matches your Local Action Group (LAG)'s strategy, then contact it to confirm the criteria, timetable and co-funding before submitting an application.

Discover the opportunities identified by the scan, then access your personalised report.